[Dsg-hallb_magnets] [New Logentry] Follow-up Re: Solenoid fast dump	at 2416 A
    beng at jlab.org 
    beng at jlab.org
       
    Fri Nov  2 11:35:02 EDT 2018
    
    
  
Logentry Text:
--
In order to better correlate the FastDAQ data produced by the cRIO and the SOE timestamps provided by the PLC we connected the fast dump contactor that goes to the SOE to the ISO amp for VT6.
Analysis is still in progress.
However, after performing 3 fast dumps under control power the PLC changes (disabling SW QD - 2nd threshold) and VT6 wiring was undone and put back to the original configuration. Voltage was injected on the test panel to ensure that VT6 was connected back properly.
---