[Dsg-hallb_magnets] [New Logentry] DBox PLC Download
    beng at jlab.org 
    beng at jlab.org
       
    Mon Feb 18 11:00:03 EST 2019
    
    
  
Logentry Text:
--
Just as we were going down to Hall B to recover the Solenoid the DBox PLC stopped responding. All the EPICS values got disconnected and the PLC itself was indicating a fault (controller display was alternating between TEST & WAIT), so a slightly different (and worse) symptom from the Solenoid PLC.
Same as with the Solenoid PLC power was cycled and the code was downloaded to the controller. Dave and Denny verified PID settings.
---
This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/3655533
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_magnets/attachments/20190218/6307d609/attachment-0001.html>
    
    
More information about the Dsg-hallb_magnets
mailing list