Hello,

Following up on the email sent in October 2018 on load cell trends for the Hall B Solenoid, attached are plots showing the Solenoid's load cell readings since January 1, 2019.

As in October 2018, the plots are colored to indicate the power status of the Torus and Solenoid:
Blue:     Solenoid ON, Torus ON
Green:  Solenoid OFF, Torus OFF
Pink:     Solenoid ON, Torus OFF
Red:      Solenoid OFF, Torus ON

All LC plots have areas from about April 24 - April 25, 2019 where the readings went to 555 lbsf that can be disregarded. This period was when the LV cRIO froze and stopped communicating with the PLC.

In general, the LCs are stable. As expected, the biggest changes are seen when both magnets are ramped. This was also seen back in October 2018.

When the magnets were both tested in negative polarity on April 18, 2019, there does not appear to be any difference in LC readings.

There are two LCs (RS86103DS_BR_T and Z86108US_BL_B) that have read zero lbsf since my last email in October 2018. Have these LCs been verified to be working correctly?

Best regards,
Tyler
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_magnets/attachments/20190501/1a920e52/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: solenoid-LC-since-2019-01-01.pdf
Type: application/pdf
Size: 872246 bytes
Desc: solenoid-LC-since-2019-01-01.pdf
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_magnets/attachments/20190501/1a920e52/attachment-0001.pdf>


More information about the Dsg-hallb_magnets mailing list