[Dsg-hallb_magnets] [New Logentry] P027 - Torus Pre-power up interlock checkout in progress
tlemon at jlab.org
tlemon at jlab.org
Mon Jul 13 11:55:01 EDT 2020
Logentry Text:
--
Torus Pre-power up Interlock Checkouts will be done today.
Probir has set up the Torus MPS with the local control power and assisted with QD test.
Brian has temporarily disabled Torus alarms during the checkouts.
Pablo and I will be completing the remaining items on the check list.
An update will be posted with the completed checklist.
---