[Dsg-hallb_magnets] [New Logentry] Hall B LCW turned off; cannot perform interlock checks until flow restored
tlemon at jlab.org
tlemon at jlab.org
Wed Apr 21 14:10:03 EDT 2021
Logentry Text:
--
Hall B LCW is turned off for work on the system.
Without LCW flow, internal MPS interlocks cannot be cleared. This interlock is internal to the MPS and cannot be bypassed. The interlock checkout procedure requires all interlocks to be clear before starting the checks.
Interlock checkout will be continued once LCW flow is restored.
---