[Dsg-hallb_magnets] Magnet Checkout

Probir Ghoshal ghoshal at jlab.org
Fri Apr 22 13:11:19 EDT 2022


Great, thanks for the update.
Thanks to you both (Brian, Pablo) and Nick S as well at all times.
I am in the Hall right now. Picked up the documentation as well.

Krister -Please plan to come over to HALLB, we can remove the controlled power around 1415-1430 hrs.
I hope to finish my checks by then.
Regards
Probir

________________________________
From: Brian Eng <beng at jlab.org>
Sent: Friday, April 22, 2022 12:36 PM
To: Probir Ghoshal <ghoshal at jlab.org>; Krister Bruhwel <bruhwel at jlab.org>
Cc: dsg-hallb magnets <dsg-hallb_magnets at jlab.org>
Subject: Magnet Checkout

Hi Probir,

We finished the torus checkout, both the checkout procedure documentation for the torus and solenoid are on the computer cart between the racks.

Let us know if you need anything else otherwise we'll assume we're done with testing.

Thanks
Brian
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_magnets/attachments/20220422/ca15aae9/attachment.html>


More information about the Dsg-hallb_magnets mailing list