Hello Pablo,
Scot is planning to install the EVs today.
Once these EVs are installed, we will test them.
Please check with Scot about the timing.
Thanks
Renuka
Dr. (Mrs.) Renuka Rajput-Ghoshal Ph.D., MInstP, CPhys
Senior Superconducting Magnet Engineer
Engineering Division
<img src="https://zimbra.jlab.org/service/home/%7E/?auth=co&id=42821&part=2.2" style="" pnsrc="cid:part1.07050308.05020003@jlab.org" alt="Jefferson
Lab" id="sig-logo" data-mce-src="https://zimbra.jlab.org/service/home/%7E/?auth=co&id=42821&part=2.2" data-mce-style="" border="0">Phone: (757) 269-5992
----- Original Message -----
From: Pablo Campero <campero@jlab.org>
To: dsg-hallb magnets <dsg-hallb_magnets@jlab.org>
Sent: Tue, 20 Dec 2016 08:18:19 -0500 (EST)
Subject: [Dsg-hallb_magnets] Updates to DBox,- Torus PLCs
Hello Ruben and Renuka;
I need to download the new routine that I programmed to set the Interlocks valves (required by the Solenoid) into the the DBox PLC.
In addition to this, is needed change the configurations for the IP Address for the DBox and Torus PLCs to be able to set the communication with the Solenoid PLC.
Please let me know if I can go ahead with this updates for both PLCs (DBox and Torus).
Best Regards
Pablo Campero