<html><body><div style="font-family: arial, helvetica, sans-serif; font-size: 12pt; color: #000000"><div>Hello Ruben,</div><div><br data-mce-bogus="1"></div><div>Attached find spreadsheet with the results of the SOE and Dump Switch operation test, that we performed yesterday.</div><div>For the remaining SOE tests like the the Quench Detection functionality, I scheduled with Probir to be make this Thursday (05/04/17).</div><div><br data-mce-bogus="1"></div><div>Best Regards </div><div>Pablo</div><div><br></div><hr id="zwchr" data-marker="__DIVIDER__"><div data-marker="__HEADERS__"><b>From: </b>"Ruben Fair" <rfair@jlab.org><br><b>To: </b>"Nicholas Sandoval" <sandoval@jlab.org><br><b>Cc: </b>"Pablo Campero Rojas" <campero@jlab.org>, "Scot Spiegel" <spiegel@jlab.org>, "Brian Eng" <beng@jlab.org>, "Krister Bruhwel" <bruhwel@jlab.org>, "Probir Ghoshal" <ghoshal@jlab.org><br><b>Sent: </b>Tuesday, May 2, 2017 12:06:32 PM<br><b>Subject: </b>Re: Hall B Solenoid - Update on SOE relay string / dump switch operation check out<br></div><br><div data-marker="__QUOTED_TEXT__">Thanks Nick<br><br>I presume the wiring has now been corrected?<br><br>Are we OK and safe to use the system as is without swapping out the SOE module to correct the display?<br><br>Did you test the E-Stop button on the MPS EPICS screen? Did it throw the dump switch?<br><br>Brian<br><br>Is there anything else you want or need to check out?<br><br>Probir<br><br>Are you still OK to test the QD functionality tomorrow? We should also talk about the water flow tests.<br><br>Regards<br><br>Ruben<br><br>> On May 2, 2017, at 11:56 AM, Nicholas Sandoval <sandoval@jlab.org> wrote:<br>> <br>> Hi Ruben,<br>> <br>> We found a problem with Scot yesterday afternoon on some of the wiring. <br>> <br>> All SOE channels work as expected, still need to test hardware QD and water flow. <br>> <br>> The SOE module does not display ch 0-7 on the local display but it does read out fine in logic.<br>> <br>> Best Regards,<br>> <br>> Nick<br>> <br>> ----- Original Message -----<br>> From: "Ruben Fair" <rfair@jlab.org><br>> To: "Pablo Campero Rojas" <campero@jlab.org>, "Nicholas Sandoval" <sandoval@jlab.org><br>> Cc: "Scot Spiegel" <spiegel@jlab.org>, "Brian Eng" <beng@jlab.org>, "Krister Bruhwel" <bruhwel@jlab.org><br>> Sent: Tuesday, May 2, 2017 11:47:12 AM<br>> Subject: Hall B Solenoid - Update on SOE relay string / dump switch operation check out<br>> <br>> Pablo, Nick, <br>> <br>> What is the status with this? <br>> <br>> Regards <br>> <br>> Ruben<br></div></div></body></html>