<html><body><div style="font-family: arial, helvetica, sans-serif; font-size: 12pt; color: #000000"><div><br></div><div>Hi Ruben,</div><div><br data-mce-bogus="1"></div><div>1. Yes, the wiring for the water flow switches has been corrected and they are working properly.</div><div><br data-mce-bogus="1"></div><div>2. I already returned all the limits in the Crycon units back to the original set values. </div><div><br data-mce-bogus="1"></div><div>Best Regards,</div><div>Pablo </div><hr id="zwchr" data-marker="__DIVIDER__"><div data-marker="__HEADERS__"><b>From: </b>"Ruben Fair" <rfair@jlab.org><br><b>To: </b>"Probir Ghoshal" <ghoshal@jlab.org>, "Mike Beck" <jbeck@jlab.org><br><b>Cc: </b>"Pablo Campero Rojas" <campero@jlab.org>, "Krister Bruhwel" <bruhwel@jlab.org>, "Scot Spiegel" <spiegel@jlab.org>, "Nicholas Sandoval" <sandoval@jlab.org><br><b>Sent: </b>Monday, May 8, 2017 3:24:00 PM<br><b>Subject: </b>Fwd: [Dsg-hallb_magnets] Hall B Solenoid - Update on SOE relay string / dump switch operation check out<br></div><br><div data-marker="__QUOTED_TEXT__"><div style="font-family: arial, helvetica, sans-serif; font-size: 12pt; color: #000000" data-mce-style="font-family: arial, helvetica, sans-serif; font-size: 12pt; color: #000000"><div>Probir, Mike,<br></div><br><div>Can you now complete the rest of the list that I shared with you - i.e. fitting G10 box and so on?<br></div><br><div>Please do not remove the hose connected between the water cooled lead ends - that must stay in place - however please drain the water-cooled leads.<br></div><br><div>Pablo,<br></div><br><div>I also understand that the water flow switches has incorrect wiring and that Scot has now corrected this?<br></div><br><div>Will you now be setting all the Cryocon limits (and any other limits that you adjusted to carry out these tests) back to their original values?<br></div><br><div>Regards<br></div><br><div>Ruben<br></div><br><br><br><hr id="zwchr"><div><b>From: </b>"Pablo Campero Rojas" <campero@jlab.org><br><b>To: </b>"dsg-hallb magnets" <dsg-hallb_magnets@jlab.org><br><b>Cc: </b>"Mike Beck" <jbeck@jlab.org><br><b>Sent: </b>Monday, May 8, 2017 3:16:46 PM<br><b>Subject: </b>Re: [Dsg-hallb_magnets] Hall B Solenoid - Update on SOE relay string / dump switch operation check out<br></div><br><div><div style="font-family: arial, helvetica, sans-serif; font-size: 12pt; color: #000000" data-mce-style="font-family: arial, helvetica, sans-serif; font-size: 12pt; color: #000000"><div>Hello Ruben,</div><br><div>Current Lead Water Flow test was completed.</div><div>A wire jumper on the terminal block (Remote control rack) was blocking the MPS to trip (Open Dump Switch), but Scot solved this issue and we completed the full test successfully. Attached find the updated spreadsheet with the details of the Test.</div><div>The hose connected between the water cooled leads ends can be removed.</div><br><div>Nick,<br></div><div>You are now enabled to pull out the SOE module to make the Display SOE test. As you can verify on the attached spreadsheet, channels 0 to 7 are not working properly, the remain channels seem to be working well.</div><br><div>Best Regards</div><div>Pablo</div><br><div> <br></div><br><hr id="zwchr"><div><b>From: </b>"Ruben Fair" <rfair@jlab.org><br><b>To: </b>"Pablo Campero Rojas" <campero@jlab.org><br><b>Cc: </b>"Mike Beck" <jbeck@jlab.org>, "Probir Ghoshal" <ghoshal@jlab.org><br><b>Sent: </b>Monday, May 8, 2017 7:48:09 AM<br><b>Subject: </b>Re: [Dsg-hallb_magnets] Hall B Solenoid - Update on SOE relay string / dump switch operation check out<br></div><br><div><div style="font-family: arial, helvetica, sans-serif; font-size: 12pt; color: #000000" data-mce-style="font-family: arial, helvetica, sans-serif; font-size: 12pt; color: #000000"><div>Excellent thank you.<br></div><br><div>I believe Mike may have checked out the water flow rates this morning - please check with him that the relevant test is now complete.<br></div><br><div>Let me know when it is complete.<br></div><br><div>Cheers<br></div><br><div>Ruben<br></div><br><br><hr id="zwchr"><div><b>From: </b>"Pablo Campero Rojas" <campero@jlab.org><br><b>To: </b>"dsg-hallb magnets" <dsg-hallb_magnets@jlab.org><br><b>Sent: </b>Friday, May 5, 2017 3:51:54 PM<br><b>Subject: </b>Re: [Dsg-hallb_magnets] Hall B Solenoid - Update on SOE relay string / dump switch operation check out<br></div><br><div><div style="font-family: arial, helvetica, sans-serif; font-size: 12pt; color: #000000" data-mce-style="font-family: arial, helvetica, sans-serif; font-size: 12pt; color: #000000"><br><div>Hello Ruben,</div><div>Attached find the updated spreadsheet with the results of the QD - SOE and MPS Dump Switch functionality Test.</div><br><div>Nick,</div><div>We did not complete with the Water Cooled Leads Flow Test, will continue the test on Monday (05//08/17). </div><div>After that, you will be able to pull out the SOE module and go ahead with your point testing hardware for the SOE module display.</div><br><div>Best Regards, </div><div>Pablo</div><hr id="zwchr"><div><b>From: </b>"Probir Ghoshal" <ghoshal@jlab.org><br><b>To: </b>"Brian Eng" <beng@jlab.org><br><b>Cc: </b>"Sarin Philip" <philip@jlab.org>, "Krister Bruhwel" <bruhwel@jlab.org>, "Pablo Campero Rojas" <campero@jlab.org>, "Ruben Fair" <rfair@jlab.org><br><b>Sent: </b>Friday, May 5, 2017 1:07:56 PM<br><b>Subject: </b>Re: Hall B Solenoid - Update on SOE relay string / dump switch operation check out<br></div><br><div>Hi Brian,<br><br>I will be in the hall with Pablo again this afternoon flow water flow test in the hall..!<br>Please come over.<br>We did the tests with our QD after the interlock issue that was from the Lead temp...!<br>Pablo has taken care off and we have completed our tests on the QD successfully.<br><br>Please come over to the hall and see if we can get hold of Mark.<br><br>Regards<br><br>Probir<br><br><br>----- Original Message -----<br>From: "Ruben Fair" <rfair@jlab.org><br>To: "Probir Ghoshal" <ghoshal@jlab.org><br>Sent: Friday, May 5, 2017 12:58:08 PM<br>Subject: Fwd: Hall B Solenoid - Update on SOE relay string / dump switch operation check out<br><br>Begin forwarded message:<br><br>> From: Brian Eng <beng@jlab.org><br>> Date: May 5, 2017 at 12:42:36 PM EDT<br>> To: Ruben Fair <rfair@jlab.org><br>> Cc: Sarin Philip <philip@jlab.org>, Krister Bruhwel <bruhwel@jlab.org>, Pablo Campero Rojas <campero@jlab.org><br>> Subject: Re: Hall B Solenoid - Update on SOE relay string / dump switch operation check out<br>> <br>> Sarin,<br>> <br>> Here's the A to ppm at a few values after Pablo changed the code to reflect the 4000A capacity.<br>> <br>> 4 A - 1000 ppm<br>> 25 A - 6250 ppm<br>> 60 A - 15000 ppm<br>> 100 A - 25000 ppm<br>> <br>> The Amps comes from the EPICS screen while the ppm was from the LCD display.<br>> <br>> Do you think Mark would be available after lunch to check to see if the safety OCP interlock is still happening?<br>> <br>> Pablo,<br>> <br>> I can verify that the lowest slew rate you can set is indeed 273 mA/s, this is due to DA 4 being set to have a min DAC value of 32.<br>> <br>>> On May 2, 2017, at 3:40 PM, Ruben Fair <rfair@jlab.org> wrote:<br>>> <br>>> Hi Sarin,<br>>> <br>>> Yes please.<br>>> <br>>> Pablo, Brian, Krister,<br>>> <br>>> Can you please liaise with Sarin to be able to work with Mark Todd to see why this interlock keeps tripping and also to confirm the A to ppm calibration?<br>>> <br>>> Many thanks<br>>> <br>>> Ruben<br></div></div><br>_______________________________________________<br>Dsg-hallb_magnets mailing list<br>Dsg-hallb_magnets@jlab.org<br>https://mailman.jlab.org/mailman/listinfo/dsg-hallb_magnets</div></div><br></div></div><br>_______________________________________________<br>Dsg-hallb_magnets mailing list<br>Dsg-hallb_magnets@jlab.org<br>https://mailman.jlab.org/mailman/listinfo/dsg-hallb_magnets</div></div><br></div></div></body></html>