<html><body><div style="font-family: arial, helvetica, sans-serif; font-size: 12pt; color: #000000"><div>Hello Ruben,</div><div><br data-mce-bogus="1"></div><div>The following task were completed today:</div><div><br data-mce-bogus="1"></div><div>Scot / Pablo  - connected all axial and radial load cells.</div><div>Brian -  completed the changes in the Sol-LV-cRIO program to replace axial load cell (AL-01) with the new one.</div><div>Brian/Pablo - Verified readout for axial and radial load cells, values as we expected:</div><div>                      The maximum variation with regards to the last measurements (compared with FUTEK measurements) was about 500 lbf. for the radial load cells. </div><div>                      Max readout for axial load cells was about 120 lbf.</div><div><br data-mce-bogus="1"></div><div>All load cell connectors were disconnected right before 4 pm today to allow the welding work in the Solenoid.</div><div>Axial load test will continue tomorrow morning.</div><div><br data-mce-bogus="1"></div><div>Best Regards,</div><div>Pablo </div><div><br></div><hr id="zwchr" data-marker="__DIVIDER__"><div data-marker="__HEADERS__"><b>From: </b>"Ruben Fair" <rfair@jlab.org><br><b>To: </b>"Pablo Campero" <campero@jlab.org>, "Scot Spiegel" <spiegel@jlab.org>, "Brian Eng" <beng@jlab.org>, "Tyler Lemon" <tlemon@jlab.org>, "Wesley Moore" <wmoore@jlab.org><br><b>Cc: </b>"Dave Kashy" <kashy@jlab.org>, "Joseph Matalevich" <josephm@jlab.org>, "Renuka Rajput-Ghoshal" <renuka@jlab.org><br><b>Sent: </b>Sunday, July 9, 2017 7:27:57 AM<br><b>Subject: </b>Hall B Solenoid - Axial Load Cells<br></div><br><div data-marker="__QUOTED_TEXT__"><div style="font-family: arial, helvetica, sans-serif; font-size: 12pt; color: #000000" data-mce-style="font-family: arial, helvetica, sans-serif; font-size: 12pt; color: #000000"><div>Chaps,<br></div><br><div>By Thursday morning 13th July, can you please complete the following:<br></div><br><div>1. Fit all axial load cells to OVC and connectorize - <strong>Scot</strong><br></div><br><div>2. Complete all lookup tables for each load cell for readings in pounds instead of kN - <strong>Brian</strong><br></div><br><div>3. Update all master Excel sheets to display both pounds and kN and update all calculations and limits to work and display in pounds (Excel, PLC and EPICS) - <strong>Pablo / Wesley</strong><br></div><br><div>3. Connect cabling and check axial load cell readouts on EPICS - <strong>Scot / Pablo</strong><br></div><br><div>Please work with Joe Matalevich (Sub Team Lead for Welding) to allow you to do this when they are not welding. <br></div><br><div>Please remember to re-fit the conductive (shorting) foam pads in the Magnet feedthrus after doing your work and disconnecting instrumentation cables.<br></div><br><div>Regards<br></div><br><div>Ruben</div></div><br></div></div></body></html>