<html><body><div style="font-family: tahoma,new york,times,serif; font-size: 14pt; color: #009900"><div>brian </div><div>thanks for trying to get the opi to load.<br></div><div>perhaps tomorrow you could explain to me nick's e-mail.<br data-mce-bogus="1"></div><div>even if i guess what being made permanent means, my question is why weren't <span style="color: rgb(255, 0, 0);" data-mce-style="color: #ff0000;">"Cables will need to be routed and landed to put the turbo speed and local gauge in the system".<span style="color: rgb(0, 128, 0);" data-mce-style="color: #008000;"> routed and landed.</span></span><br data-mce-bogus="1"></div><div>anyway, as mrs. campbell from the movie buona sera mrs. campbell said :tomorrow can only be better, given where we are today"<span id="transmark" style="display: none; width: 0px; height: 0px;"></span>.<br data-mce-bogus="1"></div><div>goodnight and godbless<br data-mce-bogus="1"></div><div><span style="display: none; width: 0px; height: 0px;"><br data-mce-bogus="1"></span></div><div><span style="display: none; width: 0px; height: 0px;"><br data-mce-bogus="1"></span></div><div><br></div><hr id="zwchr" data-marker="__DIVIDER__"><div data-marker="__HEADERS__"><b>From: </b>"Brian Eng" <beng@jlab.org><br><b>To: </b>"Nicholas Sandoval" <sandoval@jlab.org><br><b>Cc: </b>"dsg-hallb magnets" <dsg-hallb_magnets@jlab.org>, hallb-engineering@jlab.org, "Rolf Ent" <ent@jlab.org><br><b>Sent: </b>Thursday, September 14, 2017 9:55:16 PM<br><b>Subject: </b>Re: [Dsg-hallb_magnets] [New Logentry] Torus Vacuum<br></div><div><br></div><div data-marker="__QUOTED_TEXT__">Thanks for the update Nick.<br><br>Fingers crossed tomorrow goes smoother than today did.<br><br>----- Original Message -----<br>> From: "Nicholas Sandoval" <sandoval@jlab.org><br>> To: "Brian Eng" <beng@jlab.org><br>> Cc: "Dave Kashy" <kashy@jlab.org>, ent@jlab.org, "Glenn Young" <gyoung@jlab.org>, "Pablo Campero Rojas"<br>> <campero@jlab.org>, rfair@jlab.org, hallb-engineering@jlab.org, "rossi patrizia" <rossi@jlab.org>, "dsg-hallb magnets"<br>> <dsg-hallb_magnets@jlab.org><br>> Sent: Thursday, September 14, 2017 9:50:33 PM<br>> Subject: Re: [New Logentry] Torus Vacuum<br><br>> Hi Brian,<br>> <br>> The secondary turbo system was made 'permanent' after the leak was found.<br>> Cables will need to be routed and landed to put the turbo speed and local<br>> gauge in the system.<br>> <br>> TC810 is now ~6.89e-3<br>> <br>> Best Regards,<br>> Nick<br>> <br>> ----- Original Message -----<br>> From: "Brian Eng" <beng@jlab.org><br>> To: kashy@jlab.org<br>> Cc: ent@jlab.org, gyoung@jlab.org, "Pablo Campero Rojas" <campero@jlab.org>,<br>> "Nicholas Sandoval" <sandoval@jlab.org>, rfair@jlab.org,<br>> hallb-engineering@jlab.org, rossi@jlab.org, "dsg-hallb magnets"<br>> <dsg-hallb_magnets@jlab.org><br>> Sent: Thursday, September 14, 2017 9:36:02 PM<br>> Subject: Re: [New Logentry] Torus Vacuum<br>> <br>> Hi Dave,<br>> <br>> I can't seem to get the OPI website to load, but even if I could since I'm not<br>> really familiar with the vacuum system: is what you're looking for an indicator<br>> on the EPICS screen or something else?<br>> <br>> Is this something that needs to addressed now or can it be done tomorrow<br>> morning?<br>> <br>> On Sep 14, 2017 19:05, kashy@jlab.org wrote:<br>> <br>> <br>> <br>> Torus Vacuum<br>> <br>> <br>> Lognumber 3484476 . Submitted by kashy on Thu, 09/14/2017 - 19:00. Logbooks:<br>>         HBSOLENOID HBTORUS CLOG<br>> References:         3484405 - Follow-up Re: Follow-up Re: Hall B Cryogenic Problem -<br>> PLC/Comms/Blowing Reliefs<br>> <br>> <br>> The Torus Vacuum is getting worse quite quickly. TC8103 is 2.7E-2 Torr<br>> Upper turbo and the roots are still running and the average coil temperature is<br>> 38K<br>> <br>> Status of lower turbo is not displayed. We need to get the status on line!<br>_______________________________________________<br>Dsg-hallb_magnets mailing list<br>Dsg-hallb_magnets@jlab.org<br>https://mailman.jlab.org/mailman/listinfo/dsg-hallb_magnets<br></div></div></body></html>