Hi Walt,<br>
<br>
All the components for this are currently in EEL rm 125. <br>
<br>
This diagram was part of the RICH status update from ~ 3 weeks ago.<br>
<br>
<img alt="" src="cid:part1.64F956C2.73C741FB@jlab.org" height="709"
width="918"><br>
<br>
<div class="moz-cite-prefix">On 10/18/2016 11:11 AM, Walt Akers /
JLAB wrote:<br>
</div>
<blockquote cite="mid:58063BAD.9020306@jlab.org" type="cite">George:
<br>
<br>
We have a plan for the layout of the room, but I had not received
any information
<br>
about the addition of electrical infrastructure. We'll need to do
the following:
<br>
<br>
a) walk through the plan and determine where the power needs to be
installed to
<br>
support the compressor,
<br>
b) determine if there is any power in the area that is available
to support this load,
<br>
if not we'll have to determine where we're routing it from,
<br>
c) come up with a price and schedule to do the work in time to
support this activity.
<br>
<br>
If the price is too high, we may need to think about alternatives,
including using
<br>
a different compressor OR relocating the work to where the power
is available.
<br>
<br>
Still, if there is a welding outlet in the room (I'm not sure), we
may be able to
<br>
purchase and use one of the new Bertha's to support this activity.
That would
<br>
be less than $10,000.
<br>
<br>
I will walk the area with Jason as soon as possible. In the
meantime, though,
<br>
please send me a list of all of the electrical and mechanical
infrastructure that
<br>
you need to have installed in the room so we can consider it in
its entirety.
<br>
<br>
Jason: I'm doing a walk through of EEL 126 today (2:00 pm) with
someone else
<br>
from Facilities, do you want to check this out at the same time?
<br>
<br>
Walt
<br>
<br>
George Jacobs wrote:
<br>
<blockquote type="cite">Hi Walt,
<br>
<br>
The RICH air compressor has arrived, it is currently in EEL rm
125. The plan is to install it in the rm 124 clean room. This is
a large unit and requires a new power feed, 208v 3 phase 70 amp
service. I have place a work order to run this new power feed.
FM&L needs an updated floor plan and charge codes for this.
The air cooling valve panel and tank are also complete, rm 125.
I thought these were already in the floor plan.
<br>
<br>
Thanks,
<br>
George
<br>
<br>
On 10/18/2016 10:43 AM, Jason Willoughby wrote:
<br>
<blockquote type="cite">George,
<br>
<br>
Has this compressor been coordinated through Walt? This
compressor is the first time I've seen such a thing and this
was not on Walt's overall plan for the room. Please
coordinate with him and get back to me with a charge code for
the work. There really isn't a viable close 208 70A source in
the area, which means the costs of this installation are going
to be a bit high.
<br>
<br>
Jason Willoughby
<br>
FM&L Electrical Engineer
<br>
Thomas Jefferson National Accelerator Facility
<br>
628 Hofstadter Road STE 1
<br>
Newport News, VA 23606
<br>
(757)-269-5372
<br>
</blockquote>
<br>
-- <br>
George Jacobs
<br>
Jefferson Lab (TJNAF)
<br>
STE 12
<br>
12000 Jefferson Ave.
<br>
Newport News, VA 23606
<br>
<br>
(office) 757-269-7115
<br>
<br>
(cell) 757-876-0480
<br>
<br>
(<a class="moz-txt-link-abbreviated" href="mailto:email)jacobsg@jlab.org">email)jacobsg@jlab.org</a>
<br>
<br>
(website)<a class="moz-txt-link-freetext" href="https://userweb.jlab.org/~jacobsg">https://userweb.jlab.org/~jacobsg</a>
<br>
</blockquote>
<br>
<br>
</blockquote>
<br>
<pre class="moz-signature" cols="72">--
George Jacobs
Jefferson Lab (TJNAF)
STE 12
12000 Jefferson Ave.
Newport News, VA 23606
(office) 757-269-7115
(cell) 757-876-0480
(email) <a class="moz-txt-link-abbreviated" href="mailto:jacobsg@jlab.org">jacobsg@jlab.org</a>
(website) <a class="moz-txt-link-freetext" href="https://userweb.jlab.org/~jacobsg">https://userweb.jlab.org/~jacobsg</a></pre>
</body>
</html>