    Hi Marco,<br>
    <br>
    The system will not be operated prior to approval. <br>
    <br>
    As far as I know, nothing has been approved and this process is on
    hold until after the KPP. For more information, you will need to
    direct your questions to Dave Meekins, he is the DA for the RICH.<br>
    <br>
    George<br>
    <br>
    <div class="moz-cite-prefix">On 1/4/2017 10:53 AM, Marco Contalbrigo
      wrote:<br>
    </div>
    <blockquote
      cite="mid:alpine.LRH.2.20.1701041644280.11937@axpfe.fe.infn.it"
      type="cite">Hi George,
      <br>
      my question is specifically related to the RICH recommandation
      which
      <br>
      reads:
      <br>
      <br>
      The air-cooling and nitrogen gas systems are pressure systems and
      <br>
      approvals from the Pressure Systems design authority are required
      <br>
      before operation.
      <br>
      <br>
      Forgive my ignorance: I am not sure WHEN the approval should be
      <br>
      granted. I assume in order to "modify the hardware" (as you say)
      you
      <br>
      need to follow a design (already) approved by an authority.
      <br>
      Do you actually mean the DESIGN is still being modified, to get
      <br>
      approval and then a new hardware layout conform to JLab
      regulations ?
      <br>
      Or there is already a new approved design and you are as a
      <br>
      consequence working on the new hardware ?
      <br>
      <br>
      Thnaks, Marco.
      <br>
      <br>
      On Wed, 4 Jan 2017, George Jacobs wrote:
      <br>
      <br>
      <blockquote type="cite">Hi Marco,
        <br>
        <br>
        The hardware is in the process of being modified to comply with
        JLAB's pressure system requirements. This work is currently on
        <br>
        hold until after the KPP run.
        <br>
        <br>
        George
        <br>
        <br>
        On 1/4/2017 10:30 AM, Marco Contalbrigo wrote:
        <br>
              Dear George,
        <br>
              thank you so much. I appreciate the manuals and diagrams.
        Does it means the design is now approved (by the pressure
        <br>
              system Design Authority) or
        <br>
              is this still in progress ?
        <br>
              Thanks, Marco.
        <br>
        <br>
              On Wed, 4 Jan 2017, George Jacobs wrote:
        <br>
        <br>
                    I have attached the P&I diagrams along with the
        operations manual for your OSP. The hardware is being
        <br>
                    modified to comply with
        <br>
                    JLAB's pressure systems requirements.
        <br>
        <br>
                    The EPICS screens and cRIO Controls Manual are a
        separate entity.
        <br>
        <br>
                    George
        <br>
        <br>
                    On 1/4/2017 10:02 AM, Marco Contalbrigo wrote:
        <br>
                          Dear David, Marc and George,
        <br>
                          Hall-B will undergo Accelerator Readiness
        Review (ARR) next week. As part of this review, it is
        <br>
                    required to answer to
        <br>
                          the recommendations of CLAS12 ERR. For the
        RICH detector, they deal with the OSP.
        <br>
        <br>
                          To my understanding, you had a meeting in
        November to clarify the remaining issues about the RICH
        <br>
                    pressure gas
        <br>
                          system. May you provide
        <br>
                          me with an update of the OSP status ? I would
        need to send this
        <br>
                          information to Eugene Pasyuk within today.
        <br>
        <br>
                          Thank you a lot, Marco.
        <br>
        <br>
        <br>
        <br>
        <br>
        <br>
        <br>
      </blockquote>
    </blockquote>
    <br>
    <pre class="moz-signature" cols="72">-- 
George Jacobs
Jefferson Lab (TJNAF)
STE 12
12000 Jefferson Ave.
Newport News, VA 23606

(office) 757-269-7115

(cell)   757-876-0480

(email) <a class="moz-txt-link-abbreviated" href="mailto:jacobsg@jlab.org">jacobsg@jlab.org</a>

(website) <a class="moz-txt-link-freetext" href="https://userweb.jlab.org/~jacobsg">https://userweb.jlab.org/~jacobsg</a></pre>