<p>Mike, <br>
</p>
<p>This situation may be a little bit different. INFN is supplying
this piece of equipment. It is not being procured from/by
Jefferson Lab. It is their design, which they have contracted out
to the local vendor for fabrication to use on their detector.</p>
<p>Bob Miller has looked at the design and advised them to use the
Jlab procurement approved fabricators list. In this way they would
be using a fabricator which is use to following the appropriate
requirements.</p>
<p>Bob also let them know that the device would have to be load
tested, and to the best of my knowledge Doug Tilles/Bob Miller are
going to handle that aspect.</p>
<p>Doug informed me that you would need to be involved on inspecting
the welds, so you should be contacted about the visit to the
vendor, which would need to be before the device is painted.</p>
<p>Not sure if this clears any thing up, please advise. I will
attach the fab drawing.</p>
<p>Regards,</p>
<p>Marc<br>
</p>
<p><br>
</p>
<p> <br>
</p>
<br>
<div class="moz-cite-prefix">On 7/12/2017 7:46 AM, Michael Martin
wrote:<br>
</div>
<blockquote type="cite"
cite="mid:941883277.3193499.1499859997177.JavaMail.zimbra@jlab.org">
<div style="color: rgb(0, 0, 0); font-family:
arial,helvetica,sans-serif; font-size: 12pt;">
<div>Marc, I'm going to need a lot more information about this
before I confront a vendor who is fabricating a welded
component for use within J Lab. It would be completely unfair
to the vendor to show up and ask for a lot of information that
they were never told we would need and quite embarrassing for
the lab. </div>
<div>I guess first I need to know if its a code required
fabrication which is determined in ESH manual 6151, 6122,
Pressure Systems Safety Supplement or Welding and Brazing
Supplement.</div>
<div>If in fact it is a code required fabrication which it
sounds like it is then I will need the following:</div>
<div><br data-mce-bogus="1">
</div>
<div>PO or PR number to review fabrication requirements and
confirm they have been down flowed to the vendor</div>
<div>Code requirement</div>
<div>Drawings</div>
<div>Statement of work</div>
<div><br data-mce-bogus="1">
</div>
<div>These items will inform the vendor what is need by J Lab in
order for us to be able to use it and documents that must be
received with the delivery of the completed fabrication.<br
data-mce-bogus="1">
</div>
<div>Also sounds like it maybe a material handling device so I
need to know if there was a requirement to load test this item<br
data-mce-bogus="1">
</div>
<div><br data-mce-bogus="1">
</div>
<div>As you are aware the DOE has placed 10CFR 851 in place at
Jefferson Lab and we have strict QA/QC requirements for any
code welded/fabricated structure, vacuum vessel or pressure
vessels/piping that we purchase from an outside vendor or
build in house. This federal regulation has required the lab
to have programs and policies in place from our maximo
procurement system to our shipping and receiving system to
capture these fabrication at the time the procurement begins.
This appears to not have followed these steps and now we will
have to do all this quickly so we can verify code requirement
have been meet by the vendor during our visit. <br
data-mce-bogus="1">
</div>
<div><br data-mce-bogus="1">
</div>
<div>Items we would look at the vendor would be all welding
documents (welding procedures, procedure testing, welder
certifications, load test, pressure/leak testing and a
certified weld inspection done by the vendor with a certified
inspector. We would review these items and spot check welding
while in their shop. We do not offer welding inspections to
our outside vendors only a review of welding and documents by
our QA/CI welding inspector which is me.<br data-mce-bogus="1">
</div>
<div>As you can see there is quite a bite of information I will
need to look at review before we procedure to the vendor.<br
data-mce-bogus="1">
</div>
<div>The above requirements were to be down flowed to the vendor
and it would have been the responsibility or the responsible
engineer or the lab SOTR.<br data-mce-bogus="1">
</div>
<div><br data-mce-bogus="1">
</div>
<div>Please forward to me documentation as soon as possible so I
can see if we can hold you suggested visit date and time.<br
data-mce-bogus="1">
</div>
<div><br data-mce-bogus="1">
</div>
<div>thank you<br data-mce-bogus="1">
</div>
<div><br data-mce-bogus="1">
</div>
<div><br data-mce-bogus="1">
</div>
<div><br data-mce-bogus="1">
</div>
<div> <br>
</div>
<div><br>
</div>
<div data-marker="__SIG_PRE__"><br>
Michael Martin <br>
Senior QA/QC Technical Specialist<br>
ESH&Q QA/CI Group<br>
757/269/5515 Office<br>
757/303/7942 Cell/Page<br>
</div>
<br>
<hr id="zwchr" data-marker="__DIVIDER__">
<div data-marker="__HEADERS__"><b>From: </b>"Marc McMullen"
<a class="moz-txt-link-rfc2396E" href="mailto:mcmullen@jlab.org"><mcmullen@jlab.org></a><br>
<b>To: </b>"dsg-rich" <a class="moz-txt-link-rfc2396E" href="mailto:dsg-rich@jlab.org"><dsg-rich@jlab.org></a>, "Michael
Martin" <a class="moz-txt-link-rfc2396E" href="mailto:mjmartin@jlab.org"><mjmartin@jlab.org></a>, "Doug Tilles"
<a class="moz-txt-link-rfc2396E" href="mailto:tilles@jlab.org"><tilles@jlab.org></a><br>
<b>Cc: </b>"Ryan Bruce" <a class="moz-txt-link-rfc2396E" href="mailto:ryan@gandrmetals.com"><ryan@gandrmetals.com></a>,
"Patrizia Rossi" <a class="moz-txt-link-rfc2396E" href="mailto:rossi@jlab.org"><rossi@jlab.org></a><br>
<b>Sent: </b>Tuesday, July 11, 2017 4:31:40 PM<br>
<b>Subject: </b>Scheduled Visit to GandR Metals<br>
</div>
<br>
<div data-marker="__QUOTED_TEXT__">Hi Mike,<br>
<br>
Our collaborators from INFN (Italy) are having BTHLD
fabricated at one <br>
of the local shops (GandR Metals). Sandro Tomassini has
requested a <br>
visit to the shop to inspect the work, prior to painting.
Ryan Bruce <br>
(GandR) has let us know that Monday (7/17) is a good day to
visit, so I <br>
am trying to set up a time. I think the morning would be best,
maybe we <br>
could head over around 09:45 (15-20min trip).<br>
<br>
Doug mentioned that you may want to go, because the device
will need to <br>
be approved for use here at the Lab. Tyler Lemon and I would
represent <br>
the Physics Detector Support Group (we are working with INFN
to <br>
assemble, instrument and test the detector, here at the lab).<br>
<br>
If that time is good for everyone, please let me know.<br>
<br>
Regards,<br>
<br>
Marc<br>
</div>