    Hi Doug,<br>
    <br>
    This will use a R3 strong back as the "trolley" for the RICH, not
    R2. This "trolley" will also be used for the 2nd RICH detector next
    year.<br>
    <br>
    George<br>
    <br>
    <div class="moz-cite-prefix">On 10/12/2017 12:59 PM, Douglas Tilles
      wrote:<br>
    </div>
    <blockquote type="cite"
      cite="mid:470890381.4789899.1507827590930.JavaMail.zimbra@jlab.org">
      <pre wrap="">Please have George point out the R2 DC strong back he wants over to the EEL to Mark so he can show Calvin on Wed. Also point out what ever you need over there. The weight blocks will come at the same time with the Dyno 

----- Original Message -----
From: "Marco Mirazita" <a class="moz-txt-link-rfc2396E" href="mailto:Marco.Mirazita@lnf.infn.it"><Marco.Mirazita@lnf.infn.it></a>
To: "Tyler Lemon" <a class="moz-txt-link-rfc2396E" href="mailto:tlemon@jlab.org"><tlemon@jlab.org></a>
Cc: "Bob Miller" <a class="moz-txt-link-rfc2396E" href="mailto:rmiller@jlab.org"><rmiller@jlab.org></a>, "Doug Tilles" <a class="moz-txt-link-rfc2396E" href="mailto:tilles@jlab.org"><tilles@jlab.org></a>, "dsg-rich" <a class="moz-txt-link-rfc2396E" href="mailto:dsg-rich@jlab.org"><dsg-rich@jlab.org></a>
Sent: Thursday, October 12, 2017 9:37:11 AM
Subject: Re: [Dsg-rich] DC trolley and weights for RICH load test to EEL

Hello Bob and Doug,
it would be very important if the trolley could be moved in the EEL by 
Friday morning so that Dario can prepare the trolley for the load test 
before he leaves on Saturday.
Thank you,
Marco



Il 2017-10-11 21:08 Tyler Lemon ha scritto:
</pre>
      <blockquote type="cite">
        <pre wrap="">Hello Bob and Doug,

On Thursday October 19, 2017 we are planning to perform the load test
of RICH's stiffening tool here in the EEL building's high bay area.

Hall B Engineering has to provide the additional weights (~1400 lb)
necessary for the load test.

Hall B Engineering should ensure that both the DC trolley and weights
are in the EEL no later than Wednesday October 18 so that there will
be enough time to prepare for the load test the following day.

Best regards,

Tyler

_______________________________________________
Dsg-rich mailing list
<a class="moz-txt-link-abbreviated" href="mailto:Dsg-rich@jlab.org">Dsg-rich@jlab.org</a>
<a class="moz-txt-link-freetext" href="https://mailman.jlab.org/mailman/listinfo/dsg-rich">https://mailman.jlab.org/mailman/listinfo/dsg-rich</a>
</pre>
      </blockquote>
      <pre wrap="">_______________________________________________
Dsg-rich mailing list
<a class="moz-txt-link-abbreviated" href="mailto:Dsg-rich@jlab.org">Dsg-rich@jlab.org</a>
<a class="moz-txt-link-freetext" href="https://mailman.jlab.org/mailman/listinfo/dsg-rich">https://mailman.jlab.org/mailman/listinfo/dsg-rich</a>
</pre>
    </blockquote>
    <br>
    <pre class="moz-signature" cols="72">-- 
George Jacobs
Jefferson Lab (TJNAF)
STE 12
12000 Jefferson Ave.
Newport News, VA 23606

(office) 757-269-7115

(cell)   757-876-0480

(email) <a class="moz-txt-link-abbreviated" href="mailto:jacobsg@jlab.org">jacobsg@jlab.org</a>

(website) <a class="moz-txt-link-freetext" href="https://userweb.jlab.org/~jacobsg">https://userweb.jlab.org/~jacobsg</a></pre>
  </body>
</html>