<html><body><div style="font-family: times new roman,new york,times,serif; font-size: 12pt; color: #000000"><div>Hello Marco,<br></div><div><br data-mce-bogus="1"></div><div>The set of six interlock cables with the lengths you provided to be used in the nitrogen body are almost complete.<br data-mce-bogus="1"></div><div><br data-mce-bogus="1"></div><div>The six almost ready are:<br data-mce-bogus="1"></div><div>2 for inlet (3.5 m)<br>2 on the aerogel (4 m) <br>1 for outlet (1 m)<br>1 close to the EPanel (5 m)</div><div><br data-mce-bogus="1"></div><div>We do not have the internal lengths for the remaining two cables (for a total of 8 cables for the nitrogen body).<br></div><div><br data-mce-bogus="1"></div><div>Please let us know these lengths so the cables can be fabricated.<br data-mce-bogus="1"></div><div><br data-mce-bogus="1"></div><div>Best regards,<br data-mce-bogus="1"></div><div>Tyler<br data-mce-bogus="1"></div><div><br></div><hr id="zwchr" data-marker="__DIVIDER__"><div data-marker="__HEADERS__"><b>From: </b>"Marco Contalbrigo" <mcontalb@fe.infn.it><br><b>To: </b>"Tyler Lemon" <tlemon@jlab.org><br><b>Cc: </b>"dsg-rich" <dsg-rich@jlab.org><br><b>Sent: </b>Friday, October 13, 2017 11:07:16 AM<br><b>Subject: </b>Interlock sensors<br></div><br><div data-marker="__QUOTED_TEXT__">Dear Tyler,<br>as anticipated at the meeting, here is the list of<br>sensors we have in mind.<br><br>Each PCB station mounts 2 temperature (T) and 2<br>humidity (H) sensors. I would suggest we cable<br>all of them but connect only one H+T pair per<br>station to the cRio, while keeping the second<br>as spare. Should a sensor have a problem, we<br>would need an access to exchange it with his<br>spare at the cRio.<br><br>One option could be to have 4 cables in the<br>short (internal RICH) section and only 2 in the<br>outer (Hall) section. This implies however to<br>access the connectors at the RICH position to<br>be able to exchange the sensors.<br><br>-----------------<br>Electronic Panel (EPanel)<br>-----------------<br>Short section: from EPanel to patch panels<br>Lenght as the average of the power supply<br>cables: 6 m.<br><br>Long section: from patch panel to cRio<br>patch panel A: 50 feet<br>patch panel B: 65 feet<br><br>Priority is cooling monitor, electronic healty<br>and FTOF heat load control. The mimimum would<br>be 6:<br><br>1 for inlet<br>1 for outlet<br>2 on the electronics<br>1 outside the cover<br>1 on the FTOF<br><br>It is clear to have at leat 2 more (for a total<br>of 8) would be worth, to have a better control<br>of possible hot spots.<br><br>-------------------<br>N2 volume<br>-------------------<br>Short section: internal to the N2 volume, from<br>relevant locations to the 15-pin feedthrough<br>Lengths can be customized (see below).<br><br>Long section: from feed-through to the cRio.<br>Lenghts as for the patch panels.<br><br>We do not need to pass by the patch panels.<br>Priority is to monitor the inner volume and<br>control the aerogel. The minimum would be 6:<br><br>2 for inlet (3.5 m)<br>2 on the aerogel (4 m) <br>1 for outlet (1 m)<br>1 close to the EPanel (5 m)<br><br>Again, to have 2 more could be wise.<br><br>All together, the number would be 6+6=12 stations<br>(one sensor per type connected) as minimum, with<br>8+8=16 as optimum, given the cRIO capability.<br><br>On top of all, we should not forget to calibrate<br>the sensors before installation.<br><br>As anticipated, Luca Barion from INFN-FE is<br>supposed to stay at JLab in one week from now.<br>He could join the effort of sensor cabling<br>and calibration if this helps.<br><br>Thanks, Marco.<br></div></div></body></html>