<html><body><div style="font-family: tahoma,new york,times,serif; font-size: 14pt; color: #009900"><div>thanks marc for the detailed notes.<br></div><div>would the four cylinder setup, which has been approved, need to be changed, if the rich is moved to the transporter.<br data-mce-bogus="1"></div><div><br data-mce-bogus="1"></div><div><br data-mce-bogus="1"></div><div><br data-mce-bogus="1"></div><hr id="zwchr" data-marker="__DIVIDER__"><div data-marker="__HEADERS__"><b>From: </b>"Marc Mcmullen" <mcmullen@jlab.org><br><b>To: </b>"dsg-rich" <dsg-rich@jlab.org><br><b>Cc: </b>"Matthew Marchlik" <marchlik@jlab.org>, "Bob Miller" <rmiller@jlab.org>, "James Brock" <jbrock@jlab.org>, "Mark Loewus" <loewus@jlab.org><br><b>Sent: </b>Monday, December 11, 2017 11:16:08 AM<br><b>Subject: </b>[Dsg-rich] RICH Transport<br></div><div><br></div><div data-marker="__QUOTED_TEXT__"><div style="font-family: arial, helvetica, sans-serif; font-size: 12pt; color: #000000" data-mce-style="font-family: arial, helvetica, sans-serif; font-size: 12pt; color: #000000;"><div>Hi Marco,<br></div><br><div>At the meeting Friday morning we briefly covered the issue of preparing the detector for transport to hall b. I just wanted to emphasis the points related to that so that there can be some thought into what may  be required. Hopefully, this information will help with planning when you meet with Bob tomorrow.<br></div><br><div><strong>1. Relocating the trolley from the ESB lot to the EEL building</strong>.<br></div><div>    a. This will require the trolley to be lifted on to a truck, or forklifted over. Bob will need this information so he can allocate manpower.<br></div><br><div>        i. It would be prudent to inform James Brock of the Target group, he is in charge of the area which contains the loading dock.<br></div><br><div>    b. Before it is delivered, Tyler has pointed out that the area in room 125 (adjacent to the clean room) must be cleared of the shipping materials used to deliver the mirrors.<br></div><br><div>    c. If the plan is to mount the RICH onto the trolley and leave it there over the holiday shutdown, space requirements need to be considered to assure that everything will fit into the cleanroom.<br></div><br><div><strong>2. Safety Documentation</strong><br></div><div>    a. The document supplied by the DSG covers installation of the mirrors, Aerogel, and electronics. Bob will have to decide on any OSPs or Lift Plans needed for transporting.</div><br><div><br></div><div>    b. Mark Loewus needs to be contacted immediately on this matter, to ensure his availability for lift plan approval.<br></div><br><div><strong>3. Moving the RICH from the assembly structure to the cart.</strong><br></div><div>    a. I believe it was mentioned that this would be one of the last tasks to be completed before INFN staff depart next week. Many DSG members will be on vacation starting/during next week, in particular our Master Rigger     (G. Jacobs). Bob will need to know details on the lift so he can address task needs as appropriate.<br></div><br><div>    b. I have already spoke with Matt Marchlick concerning the plan to use a nitrogen bottle to abate moisture during transport, I will make sure this is all finalized before I leave for vacation. However, Bob will need to know     about this plan, since it will be implemented during transport.<br></div><br><div>Regards,<br></div><div>    </div><br><div>Marc McMullen<br>Physics Division<br>Detector Support Group<br>7738</div></div><br>_______________________________________________<br>Dsg-rich mailing list<br>Dsg-rich@jlab.org<br>https://mailman.jlab.org/mailman/listinfo/dsg-rich<br></div></div></body></html>