<html><head><meta http-equiv="content-type" content="text/html; charset=utf-8"></head><body dir="auto">Good afternoon <div><br></div><div>     The panel is now in the gas shed. Contact</div><div>Todd Ewing when your ready to start hooking it up.</div><div><br></div><div>Thanks </div><div>Denny<br><br><div id="AppleMailSignature">Sent from my iPhone</div><div><br>On Jul 13, 2018, at 12:01 PM, Tyler Lemon <<a href="mailto:tlemon@jlab.org">tlemon@jlab.org</a>> wrote:<br><br></div><blockquote type="cite"><div><div style="font-family: times new roman,new york,times,serif; font-size: 12pt; color: #000000">Hi Dave,<br><br>Thank you for checking the panel.<br><br>Once the panel is moved, DSG will set up the test, following your instruction to pipe the flow outside.<br><br>Best regards,<br>Tyler<br><br><hr id="zwchr" data-marker=""><div data-marker=""><b>From: </b>"Dave Kashy" <<a href="mailto:kashy@jlab.org">kashy@jlab.org</a>><br><b>To: </b>"Robert Miller" <<a href="mailto:rmiller@jlab.org">rmiller@jlab.org</a>>, "Denny Insley" <<a href="mailto:dinsley@jlab.org">dinsley@jlab.org</a>><br><b>Cc: </b>"Tyler Lemon" <<a href="mailto:tlemon@jlab.org">tlemon@jlab.org</a>>, "dsg-rich" <<a href="mailto:dsg-rich@jlab.org">dsg-rich@jlab.org</a>>, "George Jacobs" <<a href="mailto:jacobsg@jlab.org">jacobsg@jlab.org</a>><br><b>Sent: </b>Friday, July 13, 2018 8:26:49 AM<br><b>Subject: </b>Re: [Dsg-rich] RICH gas system updates<br></div><br><div data-marker="">Hi Bob and Denny,<br>George borrowed our gauge and tightened the fittings on the gas panel. This morning I checked them all and found 1 that I tigtened 1/4 turn more. They are all now properly set and verified proper compression using the Swagelock gage. Please transport the panel out to the gas shed. I think it should be put it inside. The DSG folks will then make some temporary connections to do the flow tests on it. They should pipe the exhaust out of the shed or have the overhead door full open while testing and remove all temporary tubing before closing the overhead door.<br><br>Dave<br><br><br>----- Original Message -----<br>From: "George Jacobs" <<a href="mailto:jacobsg@jlab.org">jacobsg@jlab.org</a>><br>To: "kashy" <<a href="mailto:kashy@jlab.org">kashy@jlab.org</a>>, "Tyler Lemon" <<a href="mailto:tlemon@jlab.org">tlemon@jlab.org</a>><br>Cc: "dsg-rich" <<a href="mailto:dsg-rich@jlab.org">dsg-rich@jlab.org</a>>, "Robert Miller" <<a href="mailto:rmiller@jlab.org">rmiller@jlab.org</a>><br>Sent: Wednesday, July 11, 2018 5:14:19 PM<br>Subject: Re: [Dsg-rich] RICH gas system updates<br><br>Hi Dave, <br><br>I will pick up the gauge in the morning. <br><br>Please find attached diagram of proposed N2 valve panel flow test configuration. This uses one of the N2 utility connections in 96B as the gas supply. <br><br>Thanks, <br>George <br><br>On 7/11/2018 4:00 PM, Dave Kashy wrote: <br><br><br><br>Tyler,<br>In order to save time I have a fitting gage on my desk.<br>You or someone else can come over to borrow it. Please return it upon finishing the work.<br><br>Thanks<br>Dave<br><br><br>----- Original Message -----<br>From: "Tyler Lemon" <<a href="mailto:tlemon@jlab.org">tlemon@jlab.org</a>> To: "dsg-rich" <<a href="mailto:dsg-rich@jlab.org">dsg-rich@jlab.org</a>> , "kashy" <<a href="mailto:kashy@jlab.org">kashy@jlab.org</a>> , "Robert Miller" <<a href="mailto:rmiller@jlab.org">rmiller@jlab.org</a>> Sent: Wednesday, July 11, 2018 3:57:37 PM<br>Subject: RICH gas system updates<br><br>Hello, <br><br>In regards to the upgraded RICH N2 panel and the email this morning, George has ordered a Swagelok gauge for ensuring the fittings are properly tightened. Once he receives the gauge, we will check the panel and tighten the necessary connections. After the panel is checked, the panel will be moved over to the Hall B Gas Shed for the full-scale flow test. DSG will need assistance from Hall B Engineering to move the panel as we do not have the transportation equipment necessary. Before the full-scale flow test, George will generate a diagram showing the panel connected to the nitrogen supply line. <br><br>DSG also has on hand a Easidew moisture transducer and fittings that will allow the transducer to be connected to RICH's nitrogen exhaust line. This moisture transducer is on RICH and is not part of the RICH pressure transducer. It is separate from the nitrogen panel upgrade. Installation of the moisture transducer would not take long. The plan is to get all parts ready, remove the existing gas line, and quickly install the moisture transducer to limit the chances moisture enters RICH. This sensor will be read by RICH's N2 cRIO and will only be monitored; no interlocks will be on the sensor. <br><br>If there are any questions on the nitrogen panel upgrade or the Easidew moisture transducer, please let us know. <br><br>Best regards, <br>Tyler<br>_______________________________________________<br>Dsg-rich mailing list <a href="mailto:Dsg-rich@jlab.org">Dsg-rich@jlab.org</a> <a href="https://mailman.jlab.org/mailman/listinfo/dsg-rich">https://mailman.jlab.org/mailman/listinfo/dsg-rich</a> <br><br><br><br>-- <br>George Jacobs<br>Jefferson Lab (TJNAF)<br>STE 12<br>12000 Jefferson Ave.<br>Newport News, VA 23606<br><br>(office) 757-269-7115<br><br>(cell)   757-876-0480<br><br>(email) <a href="mailto:jacobsg@jlab.org">jacobsg@jlab.org</a> (website) <a href="https://userweb.jlab.org/~jacobsg">https://userweb.jlab.org/~jacobsg</a><br></div></div></div></blockquote></div></body></html>