<html>
<head>
<meta http-equiv="Content-Type" content="text/html; charset=us-ascii">
</head>
<body>
<div>Thanks Kondo</div>
<div><br>
</div>
<div>Marc</div>
<hr style="display:inline-block;width:98%" tabindex="-1">
<div id="divRplyFwdMsg" dir="ltr"><font face="Calibri, sans-serif" style="font-size:11pt" color="#000000"><b>From:</b> kagnanvo@jlab.org <kagnanvo@jlab.org><br>
<b>Sent:</b> Friday, April 23, 2021 5:36 PM<br>
<b>To:</b> Marc Mcmullen <mcmullen@jlab.org><br>
<b>Cc:</b> Brad Sawatzky <brads@jlab.org>; dsg-halla_gem@jlab.org <dsg-halla_gem@jlab.org>; dsg-hallb_rich@jlab.org <dsg-hallb_rich@jlab.org>; Patrizia Rossi <rossi@jlab.org>; Kondo Gnanvo <kagnanvo@jlab.org>; Nilanga Liyanage <nilanga@jlab.org><br>
<b>Subject:</b> RE: [EXTERNAL] Re: [Dsg-halla_gem] SBS testing and assembly in EEL 124</font>
<div> </div>
</div>
<div class="BodyFragment"><font size="2"><span style="font-size:11pt;">
<div class="PlainText">Hi Marc,<br>
Yes, it is absolutely our intention to be done with the SBS GEMs and<br>
cleanup of the area by end of July.<br>
Only a major unforeseen disaster would keep us around by that time<br>
Best regards<br>
Kondo<br>
<br>
> Thanks Brad<br>
><br>
> Regards,<br>
> Marc McMullen<br>
> Sr. Instrumentation Designer<br>
> Detector Support Group<br>
> (757) 269-7738<br>
><br>
> From: Brad Sawatzky<<a href="mailto:brads@jlab.org">mailto:brads@jlab.org</a>><br>
> Sent: Friday, April 23, 2021 11:16 AM<br>
> To: Marc Mcmullen<<a href="mailto:mcmullen@jlab.org">mailto:mcmullen@jlab.org</a>><br>
> Cc: dsg-halla_gem@jlab.org<mailto:dsg-halla_gem@jlab.org>;<br>
> dsg-hallb_rich@jlab.org<mailto:dsg-hallb_rich@jlab.org>; Patrizia<br>
> Rossi<<a href="mailto:rossi@jlab.org">mailto:rossi@jlab.org</a>>; Kondo Gnanvo<<a href="mailto:kagnanvo@jlab.org">mailto:kagnanvo@jlab.org</a>>;<br>
> Nilanga Liyanage<<a href="mailto:nilanga@jlab.org">mailto:nilanga@jlab.org</a>><br>
> Subject: [EXTERNAL] Re: [Dsg-halla_gem] SBS testing and assembly in EEL<br>
> 124<br>
><br>
> Hi Marc,<br>
><br>
> Getting out by July 30 should be fine. I'm CC'ing the GEM group<br>
> leads (Kondo and Nilanga) as well.<br>
><br>
> Baring some serious unforeseen problem (that would impact the upcoming<br>
> SBS program), all the hardware should be in the Hall by that point.<br>
><br>
> -- Brad<br>
><br>
> On Fri, 23 Apr 2021, Marc Mcmullen wrote:<br>
><br>
>> Hi Brad,<br>
>><br>
>> During our last meeting we discussed the timeline for the completion of<br>
>> the<br>
>> SBS GEM assembly.<br>
>><br>
>> This was brought up during the RICH meeting this morning. The RICH<br>
>> electronics assembly and testing occupies the same area that the SBS is<br>
>> currently occupying. The RICH collaboration will need to start<br>
>> assembling<br>
>> the electronics in that area on August 2.<br>
>><br>
>> Will the GEM detectors, equipment, and materials be removed by July 30?<br>
>><br>
>> Regards,<br>
>> Marc McMullen<br>
>> Sr. Instrumentation Designer<br>
>> Detector Support Group<br>
>> (757) 269-7738<br>
><br>
> --<br>
> Brad Sawatzky, PhD <brads@jlab.org> -<>- Jefferson Lab / Hall C / C111<br>
> Ph: 757-269-5947 -<>- Fax: 757-269-5235 -<>- Pager: brads-page@jlab.org<br>
> The most exciting phrase to hear in science, the one that heralds new<br>
> discoveries, is not "Eureka!" but "That's funny..." -- Isaac Asimov<br>
><br>
><br>
<br>
<br>
</div>
</span></font></div>
</body>
</html>