It turns out I was mistaken on the mirror shipment. </div>
<div dir="ltr" style="color: rgb(0, 0, 0); background-color: rgb(255, 255, 255);">
<br>
</div>
<div dir="ltr" style="color: rgb(0, 0, 0); background-color: rgb(255, 255, 255);">
The mirrors should be picked up from JLab by the shipping company today. </div>
<div dir="ltr" style="color: rgb(0, 0, 0); background-color: rgb(255, 255, 255);">
<br>
</div>
<div dir="ltr" style="color: rgb(0, 0, 0); background-color: rgb(255, 255, 255);">
There were delays again relating to insuring the shipment since the dollar value is so high. </div>
<div dir="ltr" style="color: rgb(0, 0, 0); background-color: rgb(255, 255, 255);">
<br>
</div>
<div dir="ltr" style="color: rgb(0, 0, 0); background-color: rgb(255, 255, 255);">
-Tyler</div>
</div>
<div id="ms-outlook-mobile-signature">
<div></div>
</div>
</div>
<hr style="display:inline-block;width:98%" tabindex="-1">
<div id="divRplyFwdMsg" dir="ltr"><font face="Calibri, sans-serif" style="font-size:11pt" color="#000000"><b>From:</b> dsg-hallb_rich <dsg-hallb_rich-bounces@jlab.org> on behalf of Tyler Lemon <tlemon@jlab.org><br>
<b>Sent:</b> Friday, February 11, 2022 8:44:13 AM<br>
<b>To:</b> Marco Mirazita <Marco.Mirazita@lnf.infn.it><br>
<b>Cc:</b> dsg-hallb_rich@jlab.org <dsg-hallb_rich@jlab.org><br>
<b>Subject:</b> Re: [dsg-hallb_rich] [EXTERNAL] Re: Timeline for spherical mirrors at CMA?</font>
<div> </div>
</div>
<div>
<div>
<div>
<div dir="ltr" style="color:rgb(0,0,0); background-color:rgb(255,255,255)">The mirrors were taken to JLab shipping and receiving last week so I believe that they have been shipped. </div>
<div dir="ltr" style="color:rgb(0,0,0); background-color:rgb(255,255,255)"><br>
</div>
<div dir="ltr" style="color:rgb(0,0,0); background-color:rgb(255,255,255)">The production of the mirror mount cups is underway. We had a problem with the slicer software used to prepare the parts for the 3D printer that consistently caused an incorrect offset
at a certain point in the printing. This has hopefully been resolved. We’re printing the parts in batches of 12 so we expect to have enough to ship early next week. </div>
<div dir="ltr" style="color:rgb(0,0,0); background-color:rgb(255,255,255)"><span style="font-size:inherit"><br>
</span></div>
<div dir="ltr" style="color:rgb(0,0,0); background-color:rgb(255,255,255)"><span style="font-size:inherit">-Tyler </span></div>
</div>
<div id="x_ms-outlook-mobile-signature">
<div></div>
</div>
</div>
<hr tabindex="-1" style="display:inline-block; width:98%">
<div id="x_divRplyFwdMsg" dir="ltr"><font face="Calibri, sans-serif" color="#000000" style="font-size:11pt"><b>From:</b> Marco Mirazita <Marco.Mirazita@lnf.infn.it><br>
<b>Sent:</b> Friday, February 11, 2022 3:38:37 AM<br>
<b>To:</b> Tyler Lemon <tlemon@jlab.org><br>
<b>Cc:</b> dsg-hallb_rich@jlab.org <dsg-hallb_rich@jlab.org><br>
<b>Subject:</b> [EXTERNAL] Re: [dsg-hallb_rich] Timeline for spherical mirrors at CMA?</font>
<div> </div>
</div>
<div class="x_BodyFragment"><font size="2"><span style="font-size:11pt">
<div class="x_PlainText">Hi Tyler,<br>
the dates must be decided with CMA, as soon as they are ready to do the <br>
job.<br>
They said they need about 2 weeks after they received the 2 mirrors <br>
back, to complete the work on the frame.<br>
Then they have to prepare the mirrors to be mounted on the frame, which <br>
means they need to have the mirror mounts on hand.<br>
So, first things to know are: is the shipment of the 2 mirrors done? <br>
where we are with the production of the new mounts cup?<br>
Marco<br>
<br>
<br>
Il 2022-02-10 20:00 Tyler Lemon ha scritto:<br>
> Hello Marco M.<br>
> <br>
> Do you have any further details on the timeline for the spherical<br>
> mirrors at CMA?<br>
> <br>
> I looks like the travel authorization for me going to CMA has gotten<br>
> to the point where airline tickets can be brought.<br>
> <br>
> If I plan to be at CMA the week of February 28 - March 4, will<br>
> everything be ready for the mirrors to be tested?<br>
> <br>
> Or should the dates be pushed back a week or so?<br>
> <br>
> -Tyler<br>
> _______________________________________________<br>
> dsg-hallb_rich mailing list<br>