We will get more, then.<br>
</div>
<div id="appendonsend"></div>
<hr style="display:inline-block;width:98%" tabindex="-1">
<div id="divRplyFwdMsg" dir="ltr"><font face="Calibri, sans-serif" style="font-size:11pt" color="#000000"><b>From:</b> Marco Mirazita <Marco.Mirazita@lnf.infn.it><br>
<b>Sent:</b> Thursday, May 19, 2022 4:30 PM<br>
<b>To:</b> Tyler Lemon <tlemon@jlab.org><br>
<b>Cc:</b> dsg-hallb_rich@jlab.org <dsg-hallb_rich@jlab.org><br>
<b>Subject:</b> Re: [EXTERNAL] tentative plans for next days</font>
<div> </div>
</div>
<div class="BodyFragment"><font size="2"><span style="font-size:11pt;">
<div class="PlainText">Hi Tyler,<br>
we used part of the plastic sheet of the tents to wrap the two frontal <br>
panels. What is left over is not enough for the tedlar window.<br>
Marco<br>
<br>
<br>
Il 2022-05-19 21:54 Tyler Lemon ha scritto:<br>
> Hi Marco,<br>
> <br>
> My response in inline below.<br>
> <br>
> 1) We finished the aerogel installation on the top panel. We will<br>
> start<br>
> today the bottom panel, we should finish by tomorrow.<br>
> 2) Having on hand the mirrors, we will measure the D0 and eventually<br>
> the<br>
> reflectivity during the week end and finish by Monday. Could you<br>
> please<br>
> check that the D0 setup is ready to be used?<br>
> <br>
> The d0 set up is ready. We'll use the same laptop as the reflectivity<br>
> test station. I'll move it into place today.<br>
> <br>
> 3) We would like to have the tedlar window removed as soon as<br>
> possible.<br>
> Could it be done tomorrow?<br>
> <br>
> Yes, we'll be in the cleanroom tomorrow morning to move it.<br>
> <br>
> We also would need some plastic sheet to<br>
> protect the panel from dust till the final installation. If you need<br>
> to<br>
> buy it, please keep in mind that we will need plastic sheet also to<br>
> protect the detector during the transportation to the Hall.<br>
> <br>
> We have plastic sheets left over from the tent construction that can<br>
> be used.<br>
> <br>
> 4) On Tuesday, we would like to have the detector rotated to vertical<br>
> <br>
> position and to start the survey of the detector.<br>
> <br>
> We'll plan to have the detector rotated Tuesday morning. I'll make<br>
> the arrangements with George, Mindy, and Marc in separate email.<br>
> <br>
> -Tyler<br>
> <br>
> -------------------------<br>
> <br>
> From: Marco Mirazita <Marco.Mirazita@lnf.infn.it><br>
> Sent: Thursday, May 19, 2022 3:43 PM<br>
> To: Tyler Lemon <tlemon@jlab.org><br>
> Cc: dsg-hallb_rich@jlab.org <dsg-hallb_rich@jlab.org><br>
> Subject: [EXTERNAL] tentative plans for next days<br>
> <br>
> Hi Tyler,<br>
> we are still working to have the mirror at JLab tomorrow, but let's<br>
> assume that we can actually get them.<br>
> Here is then the plan for the next days.<br>
> <br>
> 1) We finished the aerogel installation on the top panel. We will<br>
> start<br>
> today the bottom panel, we should finish by tomorrow.<br>
> 2) Having on hand the mirrors, we will measure the D0 and eventually<br>
> the<br>
> reflectivity during the week end and finish by Monday. Could you<br>
> please<br>
> check that the D0 setup is ready to be used?<br>
> 3) We would like to have the tedlar window removed as soon as<br>
> possible.<br>
> Could it be done tomorrow? We also would need some plastic sheet to<br>
> protect the panel from dust till the final installation. If you need<br>
> to<br>
> buy it, please keep in mind that we will need plastic sheet also to<br>
> protect the detector during the transportation to the Hall.<br>
> 4) On Tuesday, we would like to have the detector rotated to vertical<br>
> position and to start the survey of the detector. The survey should be<br>
> <br>
> concluded on Wednesday with the alignment of the planar mirrors.<br>
> <br>
> For the survey and alignment of the planar mirrors, we should contact<br>
> again Chris Gould, but I think we can wait tomorrow when we will be<br>
> sure<br>
> of the mirror delivery.<br>
> I'm in the clean room if you need to discuss anything.<br>
> Thank you,<br>
> Marco<br>