[dsg-hallb_rtpc] [EXTERNAL] Leak tests on the floor of Hall B
Brian Eng
beng at jlab.org
Tue Jun 23 09:47:34 EDT 2020
Correct.
Just turn off the supply and disconnect the cable from the MFC end on the one that is currently connected.
________________________________
From: jpoudel at jlab.org <jpoudel at jlab.org>
Sent: Tuesday, June 23, 2020 9:37 AM
To: Brian Eng <beng at jlab.org>
Cc: mhattawy at odu.edu <mohammad.hattawy at gmail.com>; Bob Miller <rmiller at jlab.org>; Eric Christy <meric.christy at gmail.com>; Krister Bruhwel <bruhwel at jlab.org>; Kuhn, Sebastian E. <skuhn at odu.edu>; dsg-hallb_rtpc at jlab.org <dsg-hallb_rtpc at jlab.org>
Subject: Re: [EXTERNAL] Leak tests on the floor of Hall B
Hi Brian,
I guess you are saying this one.
Thank you,
Jiwan
On Jun 22, 2020 18:08, Brian Eng <beng at jlab.org> wrote:
Unfortunately no, I won't be able to be on-site.
________________________________
From: mhattawy at odu.edu <mohammad.hattawy at gmail.com>
Sent: Monday, June 22, 2020 5:43 PM
To: Brian Eng <beng at jlab.org>
Cc: Bob Miller <rmiller at jlab.org>; Eric Christy <meric.christy at gmail.com>; Jiwan Poudel <jpoudel at jlab.org>; Krister Bruhwel <bruhwel at jlab.org>; Kuhn, Sebastian E. <skuhn at odu.edu>; dsg-hallb_rtpc at jlab.org <dsg-hallb_rtpc at jlab.org>
Subject: Re: [EXTERNAL] Leak tests on the floor of Hall B
Hello Brian,
Will you be available to help with it tomorrow morning?
Thanks
Mohammad
On Mon, Jun 22, 2020 at 2:52 PM Brian Eng <beng at jlab.org<mailto:beng at jlab.org>> wrote:
In that case there is a bench top power supply and cables (15-pin DSUB to flying leads) located in EEL/231 (in the area immediately to the left against the wall close to the CAEN crate) that can be used to power an MFC.
Then you'll just need to figure out where best to get networking from as I don't know what's available on L0, perhaps Sergey or Nathan knows?
Make sure you can ping the MFC after reconnecting and then reinitialize it via the button on the GUI.
________________________________
From: mhattawy at odu.edu<mailto:mhattawy at odu.edu> <mohammad.hattawy at gmail.com<mailto:mohammad.hattawy at gmail.com>>
Sent: Monday, June 22, 2020 2:20 PM
To: Brian Eng <beng at jlab.org<mailto:beng at jlab.org>>
Cc: Bob Miller <rmiller at jlab.org<mailto:rmiller at jlab.org>>; Eric Christy <meric.christy at gmail.com<mailto:meric.christy at gmail.com>>; Jiwan Poudel <jpoudel at jlab.org<mailto:jpoudel at jlab.org>>; Krister Bruhwel <bruhwel at jlab.org<mailto:bruhwel at jlab.org>>; Kuhn, Sebastian E. <skuhn at odu.edu<mailto:skuhn at odu.edu>>; dsg-hallb_rtpc at jlab.org<mailto:dsg-hallb_rtpc at jlab.org> <dsg-hallb_rtpc at jlab.org<mailto:dsg-hallb_rtpc at jlab.org>>
Subject: Re: [EXTERNAL] Leak tests on the floor of Hall B
Hello Brian,
Yes, all what we need is the MFC and the local readouts. We cannot keep moving it forth and back to SFL1 after every sealing iteration. The process may take three iterations. It is not needed for today, but mostly tomorrow.
Thanks,
Mohammad.
On Mon, Jun 22, 2020 at 14:04 Brian Eng <beng at jlab.org<mailto:beng at jlab.org>> wrote:
Hi Mohammad,
I've added Krister to the CC list as he also worked with running the cable.
Honestly I'm not sure we have a long enough cables to reach from the current cRIO on SFL1N to L0 on the floor, there's some slack to allow for cart movement, but not that much.
In theory the cRIO itself could be moved to the floor since all it needs is power/networking, however it would be a rather huge undertaking to try and decable the cRIO rather than just move the detector back to SFL1.
The power to the MFC could be supplied from an external supply located near the panel, but the sensors themselves need to go to the cRIO. Is just the MFC + local readout sufficient for your testing?
________________________________
From: mhattawy at odu.edu<mailto:mhattawy at odu.edu> <mohammad.hattawy at gmail.com<mailto:mohammad.hattawy at gmail.com>>
Sent: Monday, June 22, 2020 1:44 PM
To: Brian Eng <beng at jlab.org<mailto:beng at jlab.org>>; dsg-rtpc at jlab.org<mailto:dsg-rtpc at jlab.org> <dsg-rtpc at jlab.org<mailto:dsg-rtpc at jlab.org>>
Cc: Bob Miller <rmiller at jlab.org<mailto:rmiller at jlab.org>>; Eric Christy <meric.christy at gmail.com<mailto:meric.christy at gmail.com>>; Jiwan Poudel <jpoudel at jlab.org<mailto:jpoudel at jlab.org>>; Kuhn, Sebastian E. <skuhn at odu.edu<mailto:skuhn at odu.edu>>
Subject: [EXTERNAL] Leak tests on the floor of Hall B
Hello Brian and all,
I am reaching you to ask about connecting the MFC to the Labview software. We observed major leak from our detector and we moved the detector and the gas panel to the floor. We need your help in connecting the MFC and the pressure indicators to the software to control the gas and watch the building pressure. Can you help us with this?
Best regards,
Mohammad Hattawy.
[cid:172ddfb6e835bff32ea1]
--
Best regards,
Mohammad Hattawy.
--
Best regards,
Mohammad Hattawy.
--
Best regards,
Mohammad Hattawy.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_rtpc/attachments/20200623/978d94c3/attachment.html>
More information about the dsg-hallb_rtpc
mailing list