<html>
<head>
<meta http-equiv="Content-Type" content="text/html; charset=Windows-1252">
<style type="text/css" style="display:none;"> P {margin-top:0;margin-bottom:0;} </style>
</head>
<body dir="ltr">
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
Hi Sebastian,</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
<br>
</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
1) Krister and Brian will be working on the gas panel cabling on Monday.  When the cabling is complete, we can bring the gas panel to the Hall on Tuesday or Wednesday, if the Hall is still open.  We should be able to test the gas panel in one shift and have
 it back in the EEL at the end of the day.</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
<br>
</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
2) Brian will respond.</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
<br>
</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
3) As far as I know, the gas supplied to RTPC 1 and 2 has not returned to the gas panel.  Therefore, there is no flow through the DMS.  At what point do you want to move the DMS to the mixed gas supply line?</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
<br>
</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
Regards,</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
Bob<br>
</div>
<div>
<div id="appendonsend"></div>
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
<br>
</div>
<hr tabindex="-1" style="display:inline-block; width:98%">
<div id="divRplyFwdMsg" dir="ltr"><font style="font-size:11pt" face="Calibri, sans-serif" color="#000000"><b>From:</b> Sebastian Kuhn <kuhn@jlab.org><br>
<b>Sent:</b> Friday, January 3, 2020 11:58 AM<br>
<b>To:</b> Bob Miller <rmiller@jlab.org><br>
<b>Cc:</b> Mohammad Hattawy <mohammad.hattawy@gmail.com>; JIWAN POUDEL <jpoud001@odu.edu>; dsg-rtpc@jlab.org <dsg-rtpc@jlab.org>; Nathan Baltzell <nbaltzel@odu.edu>; Carlos Ayerbe Gayoso <gayoso@jlab.org><br>
<b>Subject:</b> Re: [Dsg-rtpc] [EXTERNAL] Gas fittings for the BONuS12 DMS</font>
<div> </div>
</div>
<div class="" style="word-wrap:break-word; line-break:after-white-space">Dear Bob and all,
<div class=""><br class="">
</div>
<div class="">first of all, Happy New Year - it will be an exciting one for our experiment. </div>
<div class="">I wanted to ask two questions:</div>
<div class=""><br class="">
</div>
<div class="">1) What are the present plans for taking the existing gas panel from the EEL to the Hall? I remember that there was talk about testing out connections in the Hall sometime next week before RGB comes back online. I don’t know exactly where the
 accelerator folks are with beam restoration, but it is my understanding that this could already happen towards the middle of the week. In any case, as you know, we depend on the gas panel for tests in the EEL and would like to minimize the time without it,
 so it would be helpful to have a plan on what will happen when.</div>
<div class=""><br class="">
</div>
<div class="">2) Is there a possibility to add one more item to the gas panel? (rather belated, I know - my apologies) I realized that we really would like to be able to measure the differential pressure between the 4He gas buffer volume  (orange in the gas
 panel design drawings) and the RTPC (green). This would</div>
<div class="">a) close the loop so we have both absolute and relative pressure for all relevant parts of the system</div>
<div class="">b) allow us to monitor (and alarm on) any pressure differential between the RTPC and the buffer volume that exceeds the (rather limited) safety margin for the thin ground foil between the two.</div>
<div class=""><br class="">
</div>
<div class="">I have made a crude addition to the drawing to show where this differential pressure meter would go (see below, in heavy red lines). In addition to two more “T’s” that would have to be integrated into the existing lines, this would also require
 of course that we have a spare for such an instrument, and it would have to be added to the LabView and EPICS panels. Is this feasible?</div>
<div class=""><br class="">
</div>
<div class="">Thank you, and best greetings - Sebastian</div>
<div class=""><br class="">
</div>
<div class=""><img id="x_BC74904D-2976-46D8-BFD8-48873614A1D3" class="" style="display: inline;" data-outlook-trace="F:1|T:1" src="cid:B2F02CB3-EDE6-4D09-9BEE-6927C5296D58@wlan.odu.edu"></div>
<div class=""><br class="">
</div>
</div>
</div>
</body>
</html>