[dsg-svt] SVT Status
Brian Eng
beng at jlab.org
Wed Jan 11 16:56:24 EST 2017
The cable lacing for R4 was completed today.
All modules have been powered for calibration scans and will remain powered until it is time to decable for the transfer to the cart.
> On Jan 6, 2017, at 5:38 PM, Brian Eng <beng at jlab.org> wrote:
>
> Cabling lacing started this week, but didn't get worked on full time due to other KPP obligations. I'm hopeful it will done early-mid next week.
>
> I connected the "excepted" N2 purge setup for the EEL/124 setup per Dave's email because I'm doing gain scans on all the modules and going to leave it powered over the weekend.
>
> R4 S15 Bottom HV tripped due to current, I've lowered the voltage to 30 V. See log entry: https://logbooks.jlab.org/entry/3449908