[dsg-svt] [New Logentry] Additional MFCs for SVT
beng at jlab.org
beng at jlab.org
Mon Mar 5 16:20:02 EST 2018
Logentry Text:
--
Three additional MFCs have been installed for the new N2 cooling setup. Hall B Engineering designed and installed the system, DSG implemented the MFC controls and wiring, and Nathan handled the EPICS/CSS.
One supplies N2 to the L1C area of the SVT (L1C)
Another supplies N2 to the scattering chamber/target/support tube (Tube)
The last is for N2 outside of the SVT between it and the MVT (Outer)
The old N2 supply MFC is now connected to a pump and pulling from inside the SVT.
As with the previous single MFC setup these are controlled via EPICS (normally gas controls are done via the gas shed cRIO and EPICS is only for monitoring/alarms).
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3543198
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-svt/attachments/20180305/e7806e6e/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: SVT Gas System CSS.png
Type: image/png
Size: 20127 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/dsg-svt/attachments/20180305/e7806e6e/attachment-0001.png>
More information about the dsg-svt
mailing list