Hello Brian,
Is the SVT hardware interlock ready do be used? We already prepared the
area and placed all the crates in the racks, in the next step we will
move the CVT cart closer to the wall. The interlock operation is the
prerequisite to mount the SVT on the support tube because the sensors
will be cooled. I'd like the mounting to be done later this week. Thank you
On 3/18/21 4:31 PM, Brian Eng wrote:
> The cRIO I mentioned earlier isn't a temporary one, is is the same one
> that was previously used during beam operations. Mindy modified the
> cables so that there would be disconnects closer to the cRIO (so that
> long cables don't have to stay attached) and Peter modified the software.
>
> It won't take weeks to get the HW interlocks reconnected, I'd assume
> at most a few days, but I plan to have it fully connected the night
> after I get the go ahead that the other equipment is in position since
> I can't move any large items myself.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_svt/attachments/20210329/1e81de0d/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: gotra.vcf
Type: text/x-vcard
Size: 102 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_svt/attachments/20210329/1e81de0d/attachment.vcf>
More information about the dsg-hallb_svt
mailing list