Calibrations of R1 and R2 are done, all modules are operational. SVT
power is off, I started warming it up to room temperature. Tomorrow
morning we will proceed with Region 3 integration. The goal is to finish
cabling tomorrow and run calibrations of the whole SVT. If all goes well
I will schedule the survey and we'll go towards CVT integration.
As a backup solution for R2S13 temperature cable it could be replaced
with a spare one from Region 4. If you need access to the module, you
can remove the plastic cover. SVT will be warm soon and there won't be a
condensation issue.
On 5/6/21 6:54 PM, Brian Eng wrote:
> We haven't located the crimper for that cable yet, but as other DSG
> members come on-site they have been looking.
>
> I'll try seeing if I can narrow down if it is the cable or filter for
> the issues with SB1 later tonight.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_svt/attachments/20210506/746c7bf5/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: gotra.vcf
Type: text/x-vcard
Size: 102 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_svt/attachments/20210506/746c7bf5/attachment.vcf>
More information about the dsg-hallb_svt
mailing list