<p>Thank you Peter,</p>
<p>A comment on your statement on the flow meters. The models and
the number of the flow meters purchased (no spares) were defined
by the HBI group. I reported several times that this model is not
designed to work in magnetic field. The flow meters failed the
very first time the solenoid was turned ON. Please select a model
which would be compatible with requirements of the detector and
let me and Bob Miller know. <br>
</p>
<br>
<div class="moz-cite-prefix">On 7/13/18 11:56 AM, Peter Bonneau
wrote:<br>
</div>
<blockquote type="cite"
cite="mid:b5366f68-0abd-f041-7a01-866b6745b392@jlab.org">
<meta http-equiv="Content-Type" content="text/html; charset=utf-8">
<p><font color="#3333ff">DSG comments regarding these work
requests are in <b>blue.</b></font><br>
</p>
<div class="moz-cite-prefix">On 7/13/2018 9:55 AM, Yuri Gotra
wrote:<br>
</div>
<blockquote type="cite"
cite="mid:183b7675-942a-bf77-0f76-e73846c1569f@jlab.org">For
testing the cooling system in preparation of the SVT for beam
operations it is critical to have measurements of the coolant
flow. Both flow meters observed issues with correct reading of
the flow. The flow meters have been disconnected from the
cooling lines (control lines are still connected). Please test
the flow meters asap. <br>
</blockquote>
<font color="#3333ff">DSG will schedule in this request in with
all the other work in Halls B, C, and D we are doing in
preparation for the upcoming run. <br>
Hall B SVT does not haveĀ cooling system repair components
(external to the chillers) which was first mentioned in our
email of 1/31/2017 (listed below).</font><br>