<p>Yuri,</p>
<p>DSG has removed the flow meters and rotameter from the hall for
testing. The flow meters were used in the hall during the previous
run. After they are tested we will post results on the dsg-svt
mailing list.</p>
<p>Marc<br>
</p>
<br>
<div class="moz-cite-prefix">On 7/13/2018 12:39 PM, Yuri Gotra
wrote:<br>
</div>
<blockquote type="cite"
cite="mid:14f68992-d459-1933-48d4-671dc06299c4@jlab.org">
<meta http-equiv="Content-Type" content="text/html; charset=utf-8">
<p>Thank you Peter,</p>
<p>A comment on your statement on the flow meters. The models and
the number of the flow meters purchased (no spares) were defined
by the HBI group. I reported several times that this model is
not designed to work in magnetic field. The flow meters failed
the very first time the solenoid was turned ON. Please select a
model which would be compatible with requirements of the
detector and let me and Bob Miller know. <br>
</p>
<br>
<div class="moz-cite-prefix">On 7/13/18 11:56 AM, Peter Bonneau
wrote:<br>
</div>
<blockquote type="cite"
cite="mid:b5366f68-0abd-f041-7a01-866b6745b392@jlab.org">
<meta http-equiv="Content-Type" content="text/html;
charset=utf-8">
<p><font color="#3333ff">DSG comments regarding these work
requests are in <b>blue.</b></font><br>
</p>
<div class="moz-cite-prefix">On 7/13/2018 9:55 AM, Yuri Gotra
wrote:<br>
</div>
<blockquote type="cite"
cite="mid:183b7675-942a-bf77-0f76-e73846c1569f@jlab.org">For
testing the cooling system in preparation of the SVT for beam
operations it is critical to have measurements of the coolant
flow. Both flow meters observed issues with correct reading of
the flow. The flow meters have been disconnected from the
cooling lines (control lines are still connected). Please test
the flow meters asap. <br>
</blockquote>
<font color="#3333ff">DSG will schedule in this request in with
all the other work in Halls B, C, and D we are doing in
preparation for the upcoming run. <br>
Hall B SVT does not haveĀ cooling system repair components
(external to the chillers) which was first mentioned in our
email of 1/31/2017 (listed below).</font><br>
</blockquote>
<br>
<br>
<fieldset class="mimeAttachmentHeader"></fieldset>
<br>
<pre wrap="">_______________________________________________
dsg-svt mailing list
<a class="moz-txt-link-abbreviated" href="mailto:dsg-svt@jlab.org">dsg-svt@jlab.org</a>
<a class="moz-txt-link-freetext" href="https://mailman.jlab.org/mailman/listinfo/dsg-svt">https://mailman.jlab.org/mailman/listinfo/dsg-svt</a>
</pre>
</blockquote>
<br>
<pre class="moz-signature" cols="72">--
Marc McMullen
Detector Support Group
757-269-7738</pre>