<html>
  <head>
    <meta http-equiv="Content-Type" content="text/html; charset=UTF-8">
  </head>
  <body>
    <p><font size="+1">Hello Brian,</font></p>
    <p><font size="+1"><br>
      </font></p>
    <p><font size="+1">Thank you for your help. Since DSG could not help
        us, labeling the cables we shared between Armen, Rafayel, and
        myself. It took some time from our workflow but we survived :-).
        We already integrated one of the 3 BMT sectors, connected the
        cables and all the pedestals are good.<br>
      </font></p>
    <p><font size="+1">What I saw was all 4 chips of SVT R1S2 failed the
        same way. The weird thing is that first time they failed on
        Monday, nobody touched the SVT during the w/e and they were good
        on previous Friday. It would be great if you could help us with
        debugging, you knowledge of the FSSR2 chip is essential for this
        task. Once the issue is understoold and solved, we will proceed
        with connection region 2.<br>
      </font></p>
    <p><font size="+1"></font><br>
    </p>
    <div class="moz-cite-prefix">On 4/23/21 11:06 AM, Brian Eng wrote:<br>
    </div>
    <blockquote type="cite"
cite="mid:MN2PR09MB5515FE65A608B615955D60D7A5459@MN2PR09MB5515.namprd09.prod.outlook.com">
      <meta http-equiv="Content-Type" content="text/html; charset=UTF-8">
      <style type="text/css" style="display:none;">P {margin-top:0;margin-bottom:0;}</style>
      <div style="font-family: Calibri, Arial, Helvetica, sans-serif;
        font-size: 12pt; color: rgb(0, 0, 0);">
        Hi Yuri,</div>
      <div style="font-family: Calibri, Arial, Helvetica, sans-serif;
        font-size: 12pt; color: rgb(0, 0, 0);">
        <br>
      </div>
      <div style="font-family: Calibri, Arial, Helvetica, sans-serif;
        font-size: 12pt; color: rgb(0, 0, 0);">
        I'm still on vacation but trying to catch up on emails, I'll try
        and troubleshoot R1 M2 some more on Monday night. There isn't
        really any pins specifically for registers 17 & 18 so it's a
        bit concerning that only those are failing. It's just shift in,
        shift control, shift out and the bco clock lines to read the
        registers, but those are shared among all the chips on a module.
        So it being a bad cable or connector if 3/4 of the chips pass
        100% and 1/4 chips pass on all but 2 registers would be strange
        indeed.</div>
      <div style="font-family: Calibri, Arial, Helvetica, sans-serif;
        font-size: 12pt; color: rgb(0, 0, 0);">
        <br>
      </div>
      <div style="font-family: Calibri, Arial, Helvetica, sans-serif;
        font-size: 12pt; color: rgb(0, 0, 0);">
        For the MVT cables, is help still needed there? If so is there
        some sort of procedure that someone could follow or is it just a
        visual inspection of the cables? For the labeling do we need to
        provide the supplies or are they already on-site? Is there a
        naming scheme to follow for them?</div>
    </blockquote>
  </body>
</html>