<html>
<head>
<meta http-equiv="Content-Type" content="text/html; charset=us-ascii">
</head>
<body style="word-wrap: break-word; -webkit-nbsp-mode: space; line-break: after-white-space;" class="">
Dear Yuri,
<div class="">another important milestone!</div>
<div class="">Many thanks to you, Rafo, the Saclay team the JLab tech staff and the DSG that supported (and are supporting!!) this job.</div>
<div class="">Please, let me have the list of (external) people critical for the next steps with the timeline of their presence on-campus: we are working on an extension of the access list and the is the right time to update it.</div>
<div class="">Cheers</div>
<div class="">marco<br class="">
<div><br class="">
<blockquote type="cite" class="">
<div class="">On 12 May 2021, at 12:27, Yuri Gotra <<a href="mailto:gotra@jlab.org" class="">gotra@jlab.org</a>> wrote:</div>
<br class="Apple-interchange-newline">
<div class="">
<div class="">
<p class=""><font size="+1" class="">Dear All,</font></p>
<p class=""><font size="+1" class="">BMT integration and cabling is complete. All tiles are operational, tested with premix gas under the nominal HV settings. Pedestals are posted to the HBMVT elog. BMT is being flushed with argon. Bob will mount the BMT on
the integration cart on Friday.<br class="">
</font></p>
<p class=""><font size="+1" class="">SVT cabling is complete. All modules are operational, calibration results are posted to the HBSVT elog. SVT sensors will be kept cold until the survey.<br class="">
</font></p>
<p class=""><font size="+1" class="">Per agreement with Chris next week the survey group will do SVT survey and BMT alignment (after it is integrated with the SVT on the cart).</font></p>
<p class=""><font size="+1" class="">After the integration the CVT will be transported to the hall, craned to the space frame, and mounted on the CVT cart. At this stage we would need support from the Detector Support Group to rout and connect the cables to
the crates. We also rely on help from Mohammad in June to commission the tracker and from the Fast Electronics group on reinstalling the cosmic trigger to collect alignment data during the summer time. If travel restrictions will be eased, CEA team will join
us on the work in the hall.</font></p>
<p class=""><font size="+1" class="">Yuri and Rafayel<br class="">
</font></p>
<p class=""><font size="+1" class=""><br class="">
</font></p>
<p class=""><font size="+1" class=""></font><br class="">
</p>
</div>
<span id="cid:97A04E9A-5874-43C6-B5DF-B6CF4E336B40@fios-router.home"><gotra.vcf></span>_______________________________________________<br class="">
dsg-hallb_svt mailing list<br class="">
<a href="mailto:dsg-hallb_svt@jlab.org" class="">dsg-hallb_svt@jlab.org</a><br class="">
https://mailman.jlab.org/mailman/listinfo/dsg-hallb_svt<br class="">
</div>
</blockquote>
</div>
<br class="">
</div>
</body>
</html>