[Dsg-hallc_controls] Fwd: Adding the WRG
Steve Lassiter
lassiter at jlab.org
Fri Jul 20 10:18:07 EDT 2018
Hi,
Andy has made the hardware and wiring changes for the HMS vacuum signal and control. Now the signal and power cyling needs to be added to the HMS PLC code. I provided the code used for similar gauges used on the SHMS in a previous email.
Thanks
Steven
----- Original Message -----
From: "Andrew Kenyon" <kenyon at jlab.org>
To: "Steve Lassiter" <lassiter at jlab.org>
Cc: "Paulo Medeiros" <medeiros at jlab.org>, "John Segal" <segal at jlab.org>, "Mike Fowler" <fowler at jlab.org>
Sent: Friday, July 20, 2018 9:35:02 AM
Subject: Adding the WRG
Hi Steve,
Attached is the sheet that came with the dataforth module (I'll put the original in the storage room) and a boring description of the modifications I made to the wiring for HMS Q3's control rack to control an Edwards WRG (just like the ones on the SHMS). TLDR...The gauge's 24 V power is controlled by PLC slot 4 channel 3 and it's output (0-10 V) is read at slot 7 channel 11. Thanks.
Andy
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallc_controls/attachments/20180720/e53351f5/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Dataforth SCM5B31-03D 63590-31.pdf
Type: application/pdf
Size: 11346 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/dsg-hallc_controls/attachments/20180720/e53351f5/attachment-0001.pdf>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Modifications to HMS Q3 Control Rack Wiring.docx
Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document
Size: 30105 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/dsg-hallc_controls/attachments/20180720/e53351f5/attachment-0001.docx>