Hi,
June 05 2018 prioritized list:
Item 1 is wrong. Should have been HMS & SHMS Dipole field regulation routine at priority 1. The Rotation Shunt trip upgrade should be removed. This is mainly a hardware reconfiguration and a review of the existing code, which Mike and myself can do.
Add item 12 " Add spectrometer rotation brake control" from May 01 list to June 05 list, Priority 2. Note that the electric brakes have not been ordered yet, so detail info is not available. Hope to order soon though.
Item 14 from May 01 list was removed from the June 05 list as the new meters will not be ordered this year.
Thanks for catching the differences.
Steven
----- Original Message -----
From: "Pablo Campero" <campero at jlab.org>
To: "dsg-hallc controls" <dsg-hallc_controls at jlab.org>
Sent: Thursday, June 7, 2018 10:37:48 AM
Subject: Re: [Dsg-hallc_controls] Task and prioirties
Hello Steve,
Thanks for sending task list with their priorities; DSG will adjust our scheduled tasks based in this new priorities.
We have been comparing this new task list with the previous list sent on May 1, 2018 (See attachment) and we noticed that two or maybe three tasks has been removed and are not part of this new list.
Is the task #12 in the task list issued on May 01, 2018 the same as task #1 in new task list issued on June 05, 2018?
Please confirm if these two/three tasks (highlighted in orange in the attachment doc) are no longer need to be performed.
Best Regards,
Pablo
----- Original Message -----
From: "Steve Lassiter" <lassiter at jlab.org>
To: "dsg-hallc controls" <dsg-hallc_controls at jlab.org>
Sent: Tuesday, June 5, 2018 2:17:13 PM
Subject: [Dsg-hallc_controls] Task and prioirties
Hi,
Here is a list of the task and their priorities for the summer and beyond (Window 7 upgrade).
Task # Task description Priority
1 PLC - Rotation Shunt trip upgrade 1
2 PLC- Test Ethernet vs Controlnet interface. 1
3 PLC - New NMR communication to PSU through PLC 1
4 PLC - Add HMS Spectrometer Vacuum to controls 2
5 PLC - Data Logging upgrade, install and make operational 2
6 PLC - develop "on loop" current regulation routine for quad's PSU. 2
7 PLC - Tune valve responses 2
8 PLC - wire UPS status to controls 2
9 PLC - modify SHMS shutter not in place status 2
10 PLC - Alarm notification to on-call staff 3
11 PLC - Add HMS quadrupoles hall probe readouts to PLC 3
12 PLC - Add HMS shutter controls and status 3
13 PLC - Change SHMS LVDT I/O module from Differential to Single ended 3
14 PLC - End of life for Windows 7 upgrade to windows 10 (next year?)
4
Steven
_______________________________________________
Dsg-hallc_controls mailing list
Dsg-hallc_controls at jlab.org
https://mailman.jlab.org/mailman/listinfo/dsg-hallc_controls
_______________________________________________
Dsg-hallc_controls mailing list
Dsg-hallc_controls at jlab.org
https://mailman.jlab.org/mailman/listinfo/dsg-hallc_controls
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallc_controls/attachments/20180607/cb69d925/attachment.html>
More information about the Dsg-hallc_controls
mailing list