Hello,
Currently DSG is working on the following items:
NMR Programming:
1. Incorporate a precision current shunt into field controls and synchronize the current shunt measurements with the Lock-In Amplifier data. Write synchronized measurements to the data file.
2. Development of NMR interface code and device drivers to facilitate use of original Oxford or the new Oxford Mercury iPS power supplies.
NMR Hardware:
1. Revise RF Splitter/Attenuation box #1 to add local instrumentation status read-back. Repair attenuation control read-back.
2. Design, build, install, debug, and test hardware triggering system to synchronize the current shunt measurements with the Lock-In Amplifier data sampling.
Our work will be completed by the end of July.
I’ll be on vacation the last three weeks in August.
Peter
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hdice/attachments/20180508/d1af3774/attachment.html>
More information about the dsg-hdice
mailing list