<html>
<head>
<meta http-equiv="Content-Type" content="text/html; charset=iso-8859-1">
<style type="text/css" style="display:none;"><!-- P {margin-top:0;margin-bottom:0;} --></style>
</head>
<body dir="ltr">
<div id="divtagdefaultwrapper" style="font-size:12pt;color:#000000;font-family:Calibri,Helvetica,sans-serif;" dir="ltr">
<p style="margin-top:0;margin-bottom:0">congratulations amanda!</p>
<p style="margin-top:0;margin-bottom:0">and also to peter, mary ann, mindy, tyler, pablo who made this happen.<br>
</p>
<p style="margin-top:0;margin-bottom:0">excellent work guys.</p>
<p style="margin-top:0;margin-bottom:0"><br>
</p>
<br>
<br>
<div style="color: rgb(0, 0, 0);">
<hr style="display:inline-block;width:98%" tabindex="-1">
<div id="divRplyFwdMsg" dir="ltr"><font style="font-size:11pt" face="Calibri, sans-serif" color="#000000"><b>From:</b> dsg-hdice <dsg-hdice-bounces@jlab.org> on behalf of Amanda Hoebel <amandah@jlab.org><br>
<b>Sent:</b> Tuesday, January 29, 2019 11:09 AM<br>
<b>To:</b> dsg-hdice@jlab.org<br>
<b>Subject:</b> [dsg-hdice] Windows 10 upgrade and status of Rack #1</font>
<div> </div>
</div>
<div dir="ltr">
<div id="x_divtagdefaultwrapper" dir="ltr" style="font-size:12pt; color:#000000; font-family:Calibri,Helvetica,sans-serif">
<p style="margin-top:0; margin-bottom:0">Hi Xiangdong,</p>
<p style="margin-top:0; margin-bottom:0"><br>
</p>
<p style="margin-top:0; margin-bottom:0">The NMR program completed the test of 2,000 cycles. Each cycle takes about 2 minutes and 40 seconds to complete, and all 2,000 cycles completed in about 3 and a half days. All instrumentation was checked and is working
fine. <br>
</p>
<p style="margin-top:0; margin-bottom:0"><br>
</p>
<p style="margin-top:0; margin-bottom:0">We have completed the Windows 10 installation, fabricated signal cables, checked instrumentation, re-routed the grounding wires, incorporated the CT-box for more accurate current measurements and triggering capabilities,
built and installed the RF attenuation unit, rewrote part of the NMR program to include sensor readings, email warnings, and variable sweep parameters, upgraded LabVIEW and the NMR and FRS programs, and ran tests of the NMR and FRS programs successfully.
All tasks assigned to Rack #1 have been completed.</p>
<p style="margin-top:0; margin-bottom:0"><br>
</p>
<p style="margin-top:0; margin-bottom:0">Regards,</p>
<p style="margin-top:0; margin-bottom:0">Amanda<br>
</p>
</div>
</div>
</div>
</div>
</body>
</html>