[Eesic] [ATLis] COMMENT ON: Hall C Moeller Quad Coil Repair/Replacement Work

Peter Anthony Francis francis at jlab.org
Thu Aug 18 12:00:13 EDT 2011


Thanks for the Quick Meeting with Rick, "Neil"
I have 2 bpms that I need to disconnect electronics and cabling
to be out of your scope of work.
Everything after the 3C21 Girder needs disconnecting and removed
up to IBC3H04 but not including IBC3H04/IPM3H04H/IPM3H04V





manzlak at jlab.org wrote:
> Hall C Moeller Quad Coil Repair/Replacement Work 
> <http://opsweb.acc.jlab.org/CSUEApps/atlis/task/11405>
>
>
>     comments/History:
>
> 08/18/11 11:36 COMMENT ON by B_Manzlak:
>     /OK
>
>     Follow ISM and JLab EH&S Manual guidance.
>
>     If Scope of Work chnages --- SUSPEND WORK -- and 
>     conduct a new Task Hazard Analysis, then proceed 
>     accordingly.
>
>     Lead Brick removal ... in addition to Radiation Control 
>     Department ... Contact the Industrial Hygiene Group.
>
>     Ensure all applicable training is completed AND up to date.
>
>     As required ... Report all unwanted events, including injuries 
>     and illnesses.
>
>     If necessary, contact me:
>
>     (M) 897-2651
>     (O) ext. 7556
>     (E) manzlak at jlab.org/
> Hazard Identification Worksheet
> Task Hazard Analysis has *not* been reviewed by EHS&Q group.
>
>
>       General EHS&Q Hazards
>
> NO 	Do you require familiarization with the work area and its current 
> state? Do you need to perform a pre-job walkdown?
> NO 	Are there MSDS requirements for the materials being used with 
> which you are unfamilar?
> *YES* 	Will you create dust, welding arcs, heat, excessive noise, 
> ionizing/non-ionizing radiation, or chemical mixtures during the tasks?
>
> 	/1. Removal of grout pads & pouring new pads will create dust. Proper 
> precautions shall be used to contain/capture dust such as shop vac's 
> with HEPA filters. 2. Welding & grinding to remove & re-install quad 
> vac. beam pipe flange. This work could need flash shields. 3. Hearing 
> protection will be needed during high noise generating work. /
> NO 	Are there any fire or explosive hazards associated with the task 
> or likely to develop because of the task?
> NO 	Could the task create headaches, breathing problems, or dizziness 
> from odors, etc.?
> NO 	Is the task performed where limited entry, egress, or poor 
> ventilation exists?
> NO 	Does the task require compressed, liquefied, or noxious gases?
> NO 	Does the task require work in areas or with materials subject to 
> temperature extremes?
> *YES* 	Does the task involve the use of fork trucks, hoists, or cranes?
>
> 	/Only equipment specific qualified & approved operators are allowed 
> to operate the equipment in Hall C/
> *YES* 	Does the task involve the use of powered hand tools?
>
> 	/All work requiring hand power tools will be done IAW EH&S 6120./
> *YES* 	Does the work involve the risk of electrical shock or other 
> forms of hazardous energy?
>
> 	/All electrically powered equipment shall be LTT & disconnected by 
> qualified personnel/
> NO 	Does the task involve working above or below floor level?
> *YES* 	Does the task involve lifting, pulling, pushing, or carrying 
> heavy objects, or repetitive motion?
>
> 	/Proper lifting techniques hall be used. Use mechanical equipment 
> where ever possible./
> NO 	Does the task involve work with pressurized or vacuum vessels?
> NO 	Does the task involve drilling or cutting into any wall, floor, or 
> ceiling? If so, has this plan been approved by Facilities Management 
> for location of utilities, load bearing, etc.?
> *YES* 	Does the task require any permits?
>
> 	/Hot Work Permit for welding & grinding/
> NO 	Does the task require specialized training?
> NO 	Will waste products require special handling or disposal 
> requirements?
> NO 	Any other hazards we may have overlooked with this list?
>
>
>       Unidentified Safety Issues (USI)
>
> NO 	Does the task affect any of the credited controls listed in the 
> Accelerator Safety Envelope?
>
>
>       Radiological Hazards
>
> *YES* 	Are there any radiological hazards associated with this task?
>
> 	
> *YES* 	Will the job require disassembly of radioactive components (eg. 
> beamline components)?
>
> 	/The beam line in Hall C between the Moeller Polarimeter Scattering 
> Chamber & the Moeller Polarimeter I-Beam Girder is to be remover in 
> order remove the down stream Quad for coil repair/replacement. This 
> area needs to be surveyed prior to disassemble. All components shall 
> remain inside Hall C's Controlled area. Any waste shall be disposed of 
> according to approved policy and procedures./
> *YES* 	Will the job require Removal of items from the accelerator 
> enclosure?
>
> 	/Removed quad coil pack from quad may be RAM. Will need survey & 
> assessment./
> NO 	Will the job require Working in ventilated equipment racks (Hall A 
> or C)?
> *YES* 	Will the job potentially generate loose contamination (i.e. 
> grinding, drilling, etc. on radioactive materials)?
>
> 	/Quad beam pipe needs to have flange internal weld ground out. Needs 
> to be evaluated by Radcon. This work may require additional 
> contamination controls. Radcon will dictate these measures./
> NO 	Will the job require entering Radiation/High Radiation Areas?
> NO 	Will the job require breaching any potentially contaminated 
> systems (i.e. diffuser, dehumidifier, LCW)?
> *YES* 	Will the job require disturbing installed shielding 
> configurations?
>
> 	/There are some Pb shielding that need to be removed & reinstalled. 
> Need Radcon to assess if these areas are part of there shielding 
> configuration or just equipment protection /
> NO 	Will the job require transport of radioactive material (from one 
> building or posted area to another)?
> NO 	Other?
>
>
>     Description of Task
>
>     Vent up Vacuum in work region, disconnect beam pipe & remove bellows
>     Disconnect all power & Instrumentation cables
>     Remove QF/Collimator Girder
>     Grind out weld to remove flange on upstream end of Quad beam pipe.
>     Remove all components Between Moeller Quads & Polarimeter-Girders
>     & Stands
>     Disconnect Moeller Quad & Move onto Platform
>     Transport to Magnet Repair area Location TBD
>     Disassemble Moeller Quad
>     Disassemble spare Moeller Quad & remove good coil
>     Swap Moeller Quad damaged coil with Good Coil & Re-Assemble
>     Moeller Quad
>     Move Moeller Quad onto platform & set in place
>     Align Moeller Quad
>     Grout Moeller Stand
>     Install Quad Beam Pipe & Weld on Flange
>     Leak Check Moeller Quad Beam Pipe
>     Install All stands between Moeller Quad & Polarimeter
>     Re-Install QF/Collimator Girder
>     Align Stands
>     Install Components
>     Align Components
>     Connect Power & Instrumentation
>     Install Beam Line, Pump Down & Leak Check
>     Final Alignment
>
>
>     Impact Statement
>
>     Needed for Q-Weak Experiment
> Status
> Application: 	ATLis <http://opsweb.acc.jlab.org/CSUEApps/atlis/atlis.php>
> Task ID: 	11405
> Task Status: 	NEW
> Time Estimate: 	5 Weeks
> Required PSS: 	NA
> Priority: 	Immediately
> Scheduled: 	
> Created: 	08/18/11
> Last Modified: 	08/18/11
> Created By: 	N_Wilson (x.7265)
> Owned By: 	N_Wilson (x.7265)
> Created For: 	INSTALLATION
> Responsible: 	Ricky Taylor/Mark Weihl
> Project: 	Qweak
> Charge Code: 	
> Risk Classification
> (pre-mitigation): 	1
> Risk Classification
> (post-mitigation): 	1
>
> PPE Required
>
>     * Hard Hat
>     * Knee Pads
>     * Safety Glasses w/side shields
>     * Gloves
>     * Face Shield
>     * Safety Shoes
>     * Proper Work Clothes
>     * Ear Protection
>
> Systems
>
>     * DIAGS
>     * EH&S
>     * DC PWR
>     * MAGNET
>     * INSTALL
>     * RADCON
>     * VAC
>     * ALIGNMENT
>
> Areas
>
>     * ENCLOSURE: Hall C
>       BUILDINGS: 
>
> Attachments
>
>
>       Add an attachment...
>       <http://opsweb.acc.jlab.org/CSUEApps/atlis/task/11405?action_option=ATTACHMENTS>
>
>





More information about the Eesic mailing list