[Eesic] [ATLis] COMMENT ON: Hall C Moeller Quad Coil Repair/Replacement Work
Peter Anthony Francis
francis at jlab.org
Thu Aug 18 12:00:13 EDT 2011
Thanks for the Quick Meeting with Rick, "Neil"
I have 2 bpms that I need to disconnect electronics and cabling
to be out of your scope of work.
Everything after the 3C21 Girder needs disconnecting and removed
up to IBC3H04 but not including IBC3H04/IPM3H04H/IPM3H04V
manzlak at jlab.org wrote:
> Hall C Moeller Quad Coil Repair/Replacement Work
> <http://opsweb.acc.jlab.org/CSUEApps/atlis/task/11405>
>
>
> comments/History:
>
> 08/18/11 11:36 COMMENT ON by B_Manzlak:
> /OK
>
> Follow ISM and JLab EH&S Manual guidance.
>
> If Scope of Work chnages --- SUSPEND WORK -- and
> conduct a new Task Hazard Analysis, then proceed
> accordingly.
>
> Lead Brick removal ... in addition to Radiation Control
> Department ... Contact the Industrial Hygiene Group.
>
> Ensure all applicable training is completed AND up to date.
>
> As required ... Report all unwanted events, including injuries
> and illnesses.
>
> If necessary, contact me:
>
> (M) 897-2651
> (O) ext. 7556
> (E) manzlak at jlab.org/
> Hazard Identification Worksheet
> Task Hazard Analysis has *not* been reviewed by EHS&Q group.
>
>
> General EHS&Q Hazards
>
> NO Do you require familiarization with the work area and its current
> state? Do you need to perform a pre-job walkdown?
> NO Are there MSDS requirements for the materials being used with
> which you are unfamilar?
> *YES* Will you create dust, welding arcs, heat, excessive noise,
> ionizing/non-ionizing radiation, or chemical mixtures during the tasks?
>
> /1. Removal of grout pads & pouring new pads will create dust. Proper
> precautions shall be used to contain/capture dust such as shop vac's
> with HEPA filters. 2. Welding & grinding to remove & re-install quad
> vac. beam pipe flange. This work could need flash shields. 3. Hearing
> protection will be needed during high noise generating work. /
> NO Are there any fire or explosive hazards associated with the task
> or likely to develop because of the task?
> NO Could the task create headaches, breathing problems, or dizziness
> from odors, etc.?
> NO Is the task performed where limited entry, egress, or poor
> ventilation exists?
> NO Does the task require compressed, liquefied, or noxious gases?
> NO Does the task require work in areas or with materials subject to
> temperature extremes?
> *YES* Does the task involve the use of fork trucks, hoists, or cranes?
>
> /Only equipment specific qualified & approved operators are allowed
> to operate the equipment in Hall C/
> *YES* Does the task involve the use of powered hand tools?
>
> /All work requiring hand power tools will be done IAW EH&S 6120./
> *YES* Does the work involve the risk of electrical shock or other
> forms of hazardous energy?
>
> /All electrically powered equipment shall be LTT & disconnected by
> qualified personnel/
> NO Does the task involve working above or below floor level?
> *YES* Does the task involve lifting, pulling, pushing, or carrying
> heavy objects, or repetitive motion?
>
> /Proper lifting techniques hall be used. Use mechanical equipment
> where ever possible./
> NO Does the task involve work with pressurized or vacuum vessels?
> NO Does the task involve drilling or cutting into any wall, floor, or
> ceiling? If so, has this plan been approved by Facilities Management
> for location of utilities, load bearing, etc.?
> *YES* Does the task require any permits?
>
> /Hot Work Permit for welding & grinding/
> NO Does the task require specialized training?
> NO Will waste products require special handling or disposal
> requirements?
> NO Any other hazards we may have overlooked with this list?
>
>
> Unidentified Safety Issues (USI)
>
> NO Does the task affect any of the credited controls listed in the
> Accelerator Safety Envelope?
>
>
> Radiological Hazards
>
> *YES* Are there any radiological hazards associated with this task?
>
>
> *YES* Will the job require disassembly of radioactive components (eg.
> beamline components)?
>
> /The beam line in Hall C between the Moeller Polarimeter Scattering
> Chamber & the Moeller Polarimeter I-Beam Girder is to be remover in
> order remove the down stream Quad for coil repair/replacement. This
> area needs to be surveyed prior to disassemble. All components shall
> remain inside Hall C's Controlled area. Any waste shall be disposed of
> according to approved policy and procedures./
> *YES* Will the job require Removal of items from the accelerator
> enclosure?
>
> /Removed quad coil pack from quad may be RAM. Will need survey &
> assessment./
> NO Will the job require Working in ventilated equipment racks (Hall A
> or C)?
> *YES* Will the job potentially generate loose contamination (i.e.
> grinding, drilling, etc. on radioactive materials)?
>
> /Quad beam pipe needs to have flange internal weld ground out. Needs
> to be evaluated by Radcon. This work may require additional
> contamination controls. Radcon will dictate these measures./
> NO Will the job require entering Radiation/High Radiation Areas?
> NO Will the job require breaching any potentially contaminated
> systems (i.e. diffuser, dehumidifier, LCW)?
> *YES* Will the job require disturbing installed shielding
> configurations?
>
> /There are some Pb shielding that need to be removed & reinstalled.
> Need Radcon to assess if these areas are part of there shielding
> configuration or just equipment protection /
> NO Will the job require transport of radioactive material (from one
> building or posted area to another)?
> NO Other?
>
>
> Description of Task
>
> Vent up Vacuum in work region, disconnect beam pipe & remove bellows
> Disconnect all power & Instrumentation cables
> Remove QF/Collimator Girder
> Grind out weld to remove flange on upstream end of Quad beam pipe.
> Remove all components Between Moeller Quads & Polarimeter-Girders
> & Stands
> Disconnect Moeller Quad & Move onto Platform
> Transport to Magnet Repair area Location TBD
> Disassemble Moeller Quad
> Disassemble spare Moeller Quad & remove good coil
> Swap Moeller Quad damaged coil with Good Coil & Re-Assemble
> Moeller Quad
> Move Moeller Quad onto platform & set in place
> Align Moeller Quad
> Grout Moeller Stand
> Install Quad Beam Pipe & Weld on Flange
> Leak Check Moeller Quad Beam Pipe
> Install All stands between Moeller Quad & Polarimeter
> Re-Install QF/Collimator Girder
> Align Stands
> Install Components
> Align Components
> Connect Power & Instrumentation
> Install Beam Line, Pump Down & Leak Check
> Final Alignment
>
>
> Impact Statement
>
> Needed for Q-Weak Experiment
> Status
> Application: ATLis <http://opsweb.acc.jlab.org/CSUEApps/atlis/atlis.php>
> Task ID: 11405
> Task Status: NEW
> Time Estimate: 5 Weeks
> Required PSS: NA
> Priority: Immediately
> Scheduled:
> Created: 08/18/11
> Last Modified: 08/18/11
> Created By: N_Wilson (x.7265)
> Owned By: N_Wilson (x.7265)
> Created For: INSTALLATION
> Responsible: Ricky Taylor/Mark Weihl
> Project: Qweak
> Charge Code:
> Risk Classification
> (pre-mitigation): 1
> Risk Classification
> (post-mitigation): 1
>
> PPE Required
>
> * Hard Hat
> * Knee Pads
> * Safety Glasses w/side shields
> * Gloves
> * Face Shield
> * Safety Shoes
> * Proper Work Clothes
> * Ear Protection
>
> Systems
>
> * DIAGS
> * EH&S
> * DC PWR
> * MAGNET
> * INSTALL
> * RADCON
> * VAC
> * ALIGNMENT
>
> Areas
>
> * ENCLOSURE: Hall C
> BUILDINGS:
>
> Attachments
>
>
> Add an attachment...
> <http://opsweb.acc.jlab.org/CSUEApps/atlis/task/11405?action_option=ATTACHMENTS>
>
>
More information about the Eesic
mailing list