[Eesic] Power Work for Tomorrow
Scott Windham
windham at jlab.org
Thu Jun 23 06:46:26 EDT 2022
Based on the Rack Schedules provided by Shawn, I think this is what will be affected in the NL today:
NL09B10
NL09B14
NL10B14
NL11B14
NL12B14
NL13B14
NL14B14
NL15B14
NL16B14
We will wait for the go ahead from Cryo before powering racks down.
Scott
________________________________
From: Scott Windham
Sent: Wednesday, June 22, 2022 12:42 PM
To: EESIC <eesic at jlab.org>
Subject: Power Work for Tomorrow
I just had a conversation with Shawn about tomorrow's power outage.
Looks like Facilities will be powering down E5 and SAB at about 9am in the morning. The outage should last 1 hour. We have several camac crates that will need to be powered down before power is restored. Note**** E5 will require an SRPD for entry.
Once E5/SAB is restored, they will be moving to NL2. Shawn is working through the breaker schedules to determine locations that will be affected.
Cryo has requested the following sequence:
1. Cryo will secure their systems (remote to local??).
2. Cryo will contact I&C (Windham) to begin powering down IOCs and camac crates.
3. Once power is restored, we will power up camac then IOCs and ensure communications are up.
Thanks,
Scott
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/eesic/attachments/20220623/cad507bb/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: NL2.pdf
Type: application/pdf
Size: 385373 bytes
Desc: NL2.pdf
URL: <https://mailman.jlab.org/pipermail/eesic/attachments/20220623/cad507bb/attachment-0001.pdf>
More information about the Eesic
mailing list