<font face="Arial">All I&C Staff, <br>
<br>
The 12 Gev rule is that NO chassis, pcb, or system installation shall 
commence if final drawings are not SIGNED!<br>
As Project Engineers YOU are required to have all drawings signed prior
to the build or installation. <br>
As CAM and or 12Gev  Project Managers, you are required to insure that
all drawings are signed and completed. <br>
<br>
Therefore, if you are part of the I&C Group, I expect your drawings
to be signed whether the project is external or internal.<br>
<br>
I will have Dave Williams provide me with a list of unsigned drawings.
The compiled list will be copied to the responsible CAMs and 12Gev
Project Leaders.<br>
There is absolutely NO reason why drawings should not be signed. <br>
<br>
This is an I&C Group policy. I do not expect  EESSS  to work on
production type projects without signed-off drawings. <br>
<br>
Thanks, <br>
Omar <br>