<!DOCTYPE html PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
<head>
</head>
<body bgcolor="#ffffff" text="#000000">
<br>
<br>
-------- Original Message --------
<table class="moz-email-headers-table" border="0" cellpadding="0"
 cellspacing="0">
  <tbody>
    <tr>
      <th align="right" nowrap="nowrap" valign="baseline">Subject: </th>
      <td>LINAC Cable Installations</td>
    </tr>
    <tr>
      <th align="right" nowrap="nowrap" valign="baseline">Date: </th>
      <td>Mon, 16 Aug 2010 13:33:14 -0400</td>
    </tr>
    <tr>
      <th align="right" nowrap="nowrap" valign="baseline">From: </th>
      <td>Greg Arnold <a class="moz-txt-link-rfc2396E" href="mailto:arnold@jlab.org"><arnold@jlab.org></a></td>
    </tr>
    <tr>
      <th align="right" nowrap="nowrap" valign="baseline">To: </th>
      <td>Jonathan Creel <a class="moz-txt-link-rfc2396E" href="mailto:creel@jlab.org"><creel@jlab.org></a>, Omar Garza
<a class="moz-txt-link-rfc2396E" href="mailto:garza@jlab.org"><garza@jlab.org></a>, David Seidman <a class="moz-txt-link-rfc2396E" href="mailto:seidman@jlab.org"><seidman@jlab.org></a>, Ed
Stitts <a class="moz-txt-link-rfc2396E" href="mailto:stitts@jlab.org"><stitts@jlab.org></a>, George Greenfield
<a class="moz-txt-link-rfc2396E" href="mailto:greenfie@jlab.org"><greenfie@jlab.org></a></td>
    </tr>
    <tr>
      <th align="right" nowrap="nowrap" valign="baseline">CC: </th>
      <td>Bill Merz <a class="moz-txt-link-rfc2396E" href="mailto:merz@jlab.org"><merz@jlab.org></a>, Chuck Doty
<a class="moz-txt-link-rfc2396E" href="mailto:cdoty@jlab.org"><cdoty@jlab.org></a>, Barry Shinault <a class="moz-txt-link-rfc2396E" href="mailto:shinault@jlab.org"><shinault@jlab.org></a></td>
    </tr>
  </tbody>
</table>
<br>
<br>
<pre>Dear Staff,

Due to the West ARC LCW work and the SL15 Cryo-module work, the SL 22-26 
penetrations will not be emptied until next week. The penetrations in 
the NL 22-26 zones have been emptied and the electrician crew will start 
installing the conduits either later today or tomorrow morning.  The 
conduits will be installed in zone 22 first and then zone 26 to 
accommodate the CRYO folks as they are staged with their cabling and 
ready to start ASAP, and the other three zones will be installed in no 
particular order. Cable installations can start in the NL as soon as 
tomorrow morning in any of these zones immediatley after the 
electricians are finished installing the conduits.

If any group needs to know which conduit to use please call or page me 
me at x7388.

Greg