    <font face="Arial">Gents, <br>
      Please be prepared for system checkout, debugging, and
      modifications during the installation of SL24 Cryomodule.<br>
      The projected install is for the first week in August. <br>
      <br>
      I&C Suppport Utilization:<br>
      <br>
      LLRF<br>
      HPA /RF Interlocks<br>
      SRF Vacuum Controls & Instrumentation<br>
      Cryo Module Temperature Diode + Heater Controls    <br>
      DECARAD System<br>
      Network Setup/Configuration (if needed)<br>
      <br>
      Everyone is on deck. <br>
      <big>Be prepared! Be prepared for late days if needed. </big><br>
      <br>
      For those of you directly involved in these systems, be prepared
      to adjust your schedule accordingly. <br>
      We may need to stagger with other systems/groups to insure that we
      do not step on each others toes. <br>
      I will clarify as we get closer to the timeframe. <br>
      <br>
      I appreciate everyone's hard work. It's time to make it happen.<br>
      <br>
      This is a heads-up.<br>
      <br>
      Thanks!<br>
      Omar<br>