<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=ISO-8859-1">
  </head>
  <body bgcolor="#FFFFFF" text="#000000">
    <font face="Arial">FYI...........</font><br>
    <div class="moz-forward-container"><br>
      <br>
      -------- Original Message --------
      <table class="moz-email-headers-table" cellpadding="0"
        cellspacing="0" border="0">
        <tbody>
          <tr>
            <th align="RIGHT" nowrap="nowrap" valign="BASELINE">Subject:
            </th>
            <td>[Monday_1330] UIM Update and Plan for next week</td>
          </tr>
          <tr>
            <th align="RIGHT" nowrap="nowrap" valign="BASELINE">Date: </th>
            <td>Fri, 20 Jun 2014 11:50:35 -0400</td>
          </tr>
          <tr>
            <th align="RIGHT" nowrap="nowrap" valign="BASELINE">From: </th>
            <td>Steve Suhring <a class="moz-txt-link-rfc2396E" href="mailto:suhring@jlab.org"><suhring@jlab.org></a></td>
          </tr>
          <tr>
            <th align="RIGHT" nowrap="nowrap" valign="BASELINE">Organization:
            </th>
            <td>TJNAF</td>
          </tr>
          <tr>
            <th align="RIGHT" nowrap="nowrap" valign="BASELINE">To: </th>
            <td><a class="moz-txt-link-abbreviated" href="mailto:monday_1330@jlab.org">monday_1330@jlab.org</a></td>
          </tr>
          <tr>
            <th align="RIGHT" nowrap="nowrap" valign="BASELINE">CC: </th>
            <td>Michele Solaroli <a class="moz-txt-link-rfc2396E" href="mailto:solaroli@jlab.org"><solaroli@jlab.org></a></td>
          </tr>
        </tbody>
      </table>
      <br>
      <br>
      <meta http-equiv="content-type" content="text/html;
        charset=ISO-8859-1">
      Colleagues,<br>
      <br>
      The UIM (Utilities Infrastructure Modernization) electrical work
      has begun today with the mobilization of the subcontractor, York
      River Electric, onto the CEBAF site.<br>
      <br>
      Over the next 2.25 months, there will be significant disruption to
      the electrical grid servicing the Accelerator and End Stations.
      Although the contractor has an approved schedule outlining the
      work, changes will need to be made to the work plan as we better
      understand how to interleave the power outages with ongoing JLab
      activities.<br>
      <br>
      The present plan for the Accelerator is to start with outages to
      the FEL and GPB Monday morning. All necessary steps should be
      taken to protect equipment in these areas in advance of the power
      going off. <br>
      <br>
      Work will also begin at the services to CHL1. This work has
      minimal impact with this Cryo plant already down for planned
      maintenance.<br>
      <br>
      Finally, the third crew will be working either at and around the
      NAB Cooling Tower or at the SAB. This is under discussion. Once a
      decision is made, adequate time will be given to secure systems
      prior to the power going off.<br>
      <br>
      Work updates will be made available via ATLis: <a
        moz-do-not-send="true"
        href="http://devweb.acc.jlab.org/CSUEApps/atlis/task/14357">UIM
        Electrical Distribution Upgrade</a> and the FML Utility Outage
      Notification System. There will also be information made available
      at the MCC 0800 Meeting.<br>
      <br>
      You can also contact Steve Suhring (x7670) for Accelerator / Hall
      D questions. Michele Solaroli (x7751) is the SOTR and Dianne Owens
      (x7475) is running interference for Michele and is also a point of
      contact. <br>
      <br>
      Steve<br>
      <br>
      Steve<img src="cid:part2.08000109.04060106@jlab.org" alt=""
        height="624" width="847"><br>
      <br>
      <br>
      <br>
      <br>
    </div>
    <br>
  </body>
</html>