<html>
<head>
<meta http-equiv="Content-Type" content="text/html; charset=iso-8859-1">
<style type="text/css" style="display:none;"> P {margin-top:0;margin-bottom:0;} </style>
</head>
<body dir="ltr">
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
I just had a conversation with Shawn about tomorrow's power outage.</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
Looks like Facilities will be powering down E5 and SAB at about 9am in the morning. The outage should last 1 hour. We have several camac crates that will need to be powered down before power is restored. Note****
<span style="color: rgb(237, 92, 87);">E5 will require an SRPD for entry.</span></div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
<br>
</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
Once E5/SAB is restored, they will be moving to NL2. Shawn is working through the breaker schedules to determine locations that will be affected. </div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
Cryo has requested the following sequence:</div>
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
<div><span><br>
</span></div>
<div>
<ol>
<li><span><span> Cryo will secure their systems (remote to local??).</span><br>
</span></li><li><span><span> Cryo will contact I&C (Windham) to begin powering down IOCs and camac crates.</span></span></li><li><span><span> Once power is restored, we will power up camac then IOCs and ensure communications are up.</span></span></li></ol>
<div><span><span>Thanks,</span></span></div>
</div>
<div><span><span>Scott</span></span></div>
<div><span><span><br>
</span></span></div>
</div>
</body>
</html>