[Eg6_analysis] new rtpc bank
Dupré Raphaël
raphael.dupre at gmail.com
Fri Jul 27 01:50:46 EDT 2012
Hello,
I would suggest to have 2 or 3 dE/dx in order to test different methods.
Also a p0 can be usefull with the raw momentum for cross check.
Best,
On Fri, Jul 27, 2012 at 7:44 AM, Nathan Baltzell <baltzell at anl.gov> wrote:
> Hi EG6ers,
>
> I'm preparing the reconstructed bank for RTPC as discussed in our
> meetings and here's my thoughts. Currently I have just minimal
> information for each track:
>
> id1,id2,id3 - 3 hypotheses' pids
> p1,p2,p3 - 3 hypotheses' corrected vertex momenta
> poverq,dedx,theta,phi - drift momentum, dE/dX, and vertex angles
> vx,vy,vz - vertex position
>
> The selection of these good tracks is based upon cuts, but using the
> the cuts I use to get good calibration tracks may be overly tight:
>
> npads > 3
> fabs(sdist) < 5
> edist > -2 && edist < 5
> fabs(doca) < 0.002
> chi2 > 0.3 && chi2 < 3
> fabs(zvertex) < 100
>
> Loosening them and including those additional variables in the bank
> may be good:
>
> chi2 - of the helix fit
> doca - DOCA of the helix to the beamline
> sdist - path length from the first hit to the start of the drift region
> edist - path length from the last hit to the end of the drift region
> npads - number of hit pads
>
>
> -Nathan
> _______________________________________________
> Eg6_analysis mailing list
> Eg6_analysis at jlab.org
> https://mailman.jlab.org/mailman/listinfo/eg6_analysis
>
--
Raphaël Dupré
-------------- next part --------------
An HTML attachment was scrubbed...
URL: https://mailman.jlab.org/pipermail/eg6_analysis/attachments/20120727/65af5e53/attachment.html
More information about the Eg6_analysis
mailing list