<html xmlns:v="urn:schemas-microsoft-com:vml" xmlns:o="urn:schemas-microsoft-com:office:office" xmlns:w="urn:schemas-microsoft-com:office:word" xmlns:m="http://schemas.microsoft.com/office/2004/12/omml" xmlns="http://www.w3.org/TR/REC-html40">
<head>
<meta http-equiv="Content-Type" content="text/html; charset=us-ascii">
<meta name="Generator" content="Microsoft Word 15 (filtered medium)">
<style><!--
/* Font Definitions */
@font-face
        {font-family:"Cambria Math";
        panose-1:2 4 5 3 5 4 6 3 2 4;}
@font-face
        {font-family:Calibri;
        panose-1:2 15 5 2 2 2 4 3 2 4;}
@font-face
        {font-family:Cambria;
        panose-1:2 4 5 3 5 4 6 3 2 4;}
@font-face
        {font-family:Roboto;}
/* Style Definitions */
p.MsoNormal, li.MsoNormal, div.MsoNormal
        {margin:0in;
        font-size:11.0pt;
        font-family:"Calibri",sans-serif;}
a:link, span.MsoHyperlink
        {mso-style-priority:99;
        color:#0563C1;
        text-decoration:underline;}
span.EmailStyle17
        {mso-style-type:personal-compose;
        font-family:"Calibri",sans-serif;
        color:windowtext;}
.MsoChpDefault
        {mso-style-type:export-only;
        font-family:"Calibri",sans-serif;}
@page WordSection1
        {size:8.5in 11.0in;
        margin:1.0in 1.0in 1.0in 1.0in;}
div.WordSection1
        {page:WordSection1;}
--></style><!--[if gte mso 9]><xml>
<o:shapedefaults v:ext="edit" spidmax="1026" />
</xml><![endif]--><!--[if gte mso 9]><xml>
<o:shapelayout v:ext="edit">
<o:idmap v:ext="edit" data="1" />
</o:shapelayout></xml><![endif]-->
</head>
<body lang="EN-US" link="#0563C1" vlink="#954F72" style="word-wrap:break-word">
<div class="WordSection1">
<p class="MsoNormal"><i><span style="font-family:"Cambria",serif;color:black">Sent on Behalf of Jim Yeck, EIC Project Director </span></i><span style="color:black"><o:p></o:p></span></p>
<p class="MsoNormal"><span style="color:black"> <o:p></o:p></span></p>
<p class="MsoNormal" style="background:white"><span style="font-family:"Cambria",serif;color:black">Dear EIC Staff:</span><span style="color:black"><o:p></o:p></span></p>
<p class="MsoNormal" style="background:white"><span style="font-family:"Cambria",serif;color:black"> </span><span style="color:black"><o:p></o:p></span></p>
<p class="MsoNormal" style="background:white"><span style="font-family:"Cambria",serif;color:black">BNL, JLab, and our collaborators continue to move forward with the design and planning of the EIC facility.  During this ramp up phase of the project the pace
 of our progress is constrained by the available funding.  Current funding supports the addition of personnel and critical hires and we will continue to introduce the people joining the EIC team at the regular coffee breaks.  There are two changes in engineering
 leadership roles I would like to highlight.</span><span style="color:black"><o:p></o:p></span></p>
<p class="MsoNormal" style="background:white"><span style="font-family:"Cambria",serif;color:black"> </span><span style="color:black"><o:p></o:p></span></p>
<p class="MsoNormal" style="background:white"><span style="font-family:"Cambria",serif;color:black">Katherine Wilson, JLab, joined EIC Partnership Project (EICPP) leadership team as the EICPP Project Engineer.  Katherine has 26 years of engineering experience,
 over 22 years of which are at Jefferson Lab.  She was involved in most of the cryomodule projects during that time, as well as beam transport and detector design.</span><span style="color:black">  </span><span style="font-family:"Cambria",serif;color:black"> In
 her new role, Katherine will support the Deputy Project Manager as the lead engineer for the Jefferson Lab EICPP, managing the overall EIC engineering for Jefferson Lab, including coordination and integration activities with the BNL EIC Project Team and future
 project partners. </span><span style="color:black"><o:p></o:p></span></p>
<p class="MsoNormal" style="background:white"><span style="font-family:"Cambria",serif;color:black"> </span><span style="color:black"><o:p></o:p></span></p>
<p class="MsoNormal"><span style="font-family:"Cambria",serif;color:black">Kevin Smith will move to a new role as the Deputy Technical Director.  Kevin has played a key role to date as the Deputy Level 2 WBS Manager for RF and also as the BNL Deputy Technical
 Systems Division Director.  Kevin joined BNL in 1988 and has been involved in the design, construction, commissioning and operation of accelerator systems for over 32 years.  Prior to joining the EIC, he served as Deputy Head of Collider-Accelerator RF Systems,
 SRF Group Leader and LLRF Head.</span><span style="font-size:11.5pt;font-family:Roboto;color:black"> </span><span style="color:black"> </span><span style="font-family:"Cambria",serif;color:black">As the Deputy Technical Director, Kevin will support the Technical
 Director in developing and executing the EIC project to achieve the design technical performance of the EIC scope and provide technical direction, oversight, and coordination for project-wide engineering activities.</span><span style="color:black"><o:p></o:p></span></p>
<p class="MsoNormal" style="background:white"><span style="color:black"> <o:p></o:p></span></p>
<p class="MsoNormal" style="background:white"><span style="font-family:"Cambria",serif;color:black">These changes and others are part of a wider effort within the project to strengthen design and engineering capabilities as we transition into preliminary design
 and prepare for construction.  The original focus of the EIC Executive Management Team (EMT) was strategic issues including securing CD-1, detector selection, promoting partnership, and preparation for CD-2/3A.  The focus of EMT meetings will need to broaden
 to address implementation plans and issues.  We will modify the format and participation in the EIC meetings accordingly.</span><span style="color:black"><o:p></o:p></span></p>
<p class="MsoNormal" style="background:white"><span style="color:black"> <o:p></o:p></span></p>
<p class="MsoNormal" style="background:white"><span style="font-family:"Cambria",serif;color:black">Two weeks ago BNL and JLab leaders and the EIC Executive Management Team met with the DOE Office of Nuclear Physics (ONP) and the Office of Project Assessment
 (OPA) at their offices in Germantown, Maryland.  The purpose of the meeting was to discuss EIC progress and plans, and in particular the current project planning assumptions.   The OPA and ONP directors recognized the outstanding progress made by our team
 in a very short period of time and the reality that funding is constraining the desired ramp up in staffing and effort needed at this critical stage.  The immediate planning issue under discussion is a revision to the reference funding profile used for project
 planning.  The revised profile will address both the actual funding received in FY2022, a 50% increase over FY2021, and the funding possibilities for FY2023 which range from level to double FY2022.  We will continue to lean forward and mature our designs and
 update cost estimates and schedules.  The Federal Project Director will conduct an EIC Status Meeting on June 28-30, 2022.  An OPA review is planned for the end of the calendar year.</span><span style="color:black"><o:p></o:p></span></p>
<p class="MsoNormal" style="background:white"><span style="font-family:"Cambria",serif;color:black"> </span><span style="color:black"><o:p></o:p></span></p>
<p class="MsoNormal" style="background:white"><span style="font-family:"Cambria",serif;color:black">There will be an EIC All Hands meeting in the next couple of weeks to elaborate on these topics and others.  </span><span style="color:black"><o:p></o:p></span></p>
<p class="MsoNormal" style="background:white"><span style="font-family:"Cambria",serif;color:black"> </span><span style="color:black"><o:p></o:p></span></p>
<p class="MsoNormal" style="background:white"><span style="font-family:"Cambria",serif;color:black">Sincerely, </span><span style="color:black"><o:p></o:p></span></p>
<p class="MsoNormal" style="background:white"><span style="font-family:"Cambria",serif;color:black">Jim<o:p></o:p></span></p>
<p class="MsoNormal" style="background:white"><span style="font-family:"Cambria",serif;color:black"><o:p> </o:p></span></p>
<p class="MsoNormal"><span style="font-family:"Cambria",serif;color:black">Jim Yeck</span><o:p></o:p></p>
<p class="MsoNormal"><span style="font-family:"Cambria",serif;color:black">Associate Laboratory Director & EIC Project Director</span><span style="font-size:10.0pt"><o:p></o:p></span></p>
<p class="MsoNormal"><span style="font-family:"Cambria",serif;color:black">Electron-Ion Collider</span><o:p></o:p></p>
<p class="MsoNormal"><span style="font-family:"Cambria",serif;color:black">Brookhaven National Laboratory</span><o:p></o:p></p>
<p class="MsoNormal"><span style="font-family:"Cambria",serif;color:black">C: (608) 999-1740</span><o:p></o:p></p>
<p class="MsoNormal"><i><span style="font-family:"Cambria",serif;color:black">Alyssa Petrone, Assistant, <a href="mailto:apetrone@bnl.gov"><span style="color:#954F72">apetrone@bnl.gov</span></a></span></i><o:p></o:p></p>