Reminder to all ENG staff:
Work Planning tools should be used to provide timely updates especially
when utilities, infrastructure or
hardware is altered which affects other workgroups.
- All workers should be properly trained and authorized to conduct
assigned work. Work control documents that contain "feedback and
improvement" sections should be reviewed more thoroughly when resuming
work to ensure that all hazards are controlled.
- If the work control process requires specific disciplines to be
present for pre-briefings, walk-downs, etc., then work should not
commence until they have had a chance to properly and thoroughly review
the job.
- The proper equipment has to be utilized for the work. If the proper
equipment cannot be located, then work shall not proceed until it is
made available.
- Communication between management and workers needs to be clear and
concise. If work is planned to be completed in an urgent manner, then
all risks and hazards introduced by the urgency must be fully
identified, understood and controlled.
- Stop Work authority is a control available to all workers to prevent
mishaps. All workers must be vigilant in stopping work if there are
newly- recognized hazards that have not been properly controlled.
--
Henry Robertson
Safety Systems Group
DSO - Engineering Division
PH# - 757.269.7285
FAX - 757.269.7658
http://www.jlab.org/accel/ssg/
-------------- next part --------------
An HTML attachment was scrubbed...
URL: https://mailman.jlab.org/pipermail/eng-div/attachments/20131031/fd3f4a86/attachment.html
More information about the Eng-div
mailing list