<html><head><style type='text/css'>p { margin: 0; }</style></head><body><div style='font-family: arial,helvetica,sans-serif; font-size: 12pt; color: #000000'><DIV style="FONT-STYLE: normal; FONT-FAMILY: Helvetica,Arial,sans-serif; COLOR: #000; FONT-SIZE: 12pt; FONT-WEIGHT: normal; TEXT-DECORATION: none">
<STYLE>p { margin: 0; }</STYLE>

<DIV style="FONT-FAMILY: tahoma,new york,times,serif; COLOR: #000000; FONT-SIZE: 12pt"><BR>
<P style="LINE-HEIGHT: normal; MARGIN-BOTTOM: 0pt" class=MsoNormal><SPAN style="FONT-FAMILY: 'Times New Roman','serif'; FONT-SIZE: 11.5pt">Accelerator Seminar</SPAN></P>
<P style="LINE-HEIGHT: normal; MARGIN-BOTTOM: 0pt" class=MsoNormal><SPAN style="FONT-FAMILY: 'Times New Roman','serif'; FONT-SIZE: 11.5pt"><BR></SPAN></P>
<P style="LINE-HEIGHT: normal; MARGIN-BOTTOM: 0pt" class=MsoNormal><SPAN style="FONT-FAMILY: 'Times New Roman','serif'; FONT-SIZE: 11.5pt">“Search for the Mixed Phase in Dense Baryonic Matter: NICA Project at JINR”</SPAN></P>
<P style="LINE-HEIGHT: normal; MARGIN-BOTTOM: 0pt" class=MsoNormal><SPAN style="FONT-FAMILY: 'Times New Roman','serif'; FONT-SIZE: 11.5pt">&nbsp;</SPAN></P>
<P style="LINE-HEIGHT: normal; MARGIN-BOTTOM: 0pt" class=MsoNormal><SPAN style="FONT-FAMILY: 'Times New Roman','serif'; FONT-SIZE: 11.5pt">Igor Meshkov</SPAN></P>
<P style="LINE-HEIGHT: normal; MARGIN-BOTTOM: 0pt" class=MsoNormal><SPAN style="FONT-FAMILY: 'Times New Roman','serif'; FONT-SIZE: 11.5pt">Joint Institute of Nuclear Research</SPAN></P>
<P class=Default><SPAN style="FONT-FAMILY: 'Times New Roman','serif'; FONT-SIZE: 14pt">&nbsp;</SPAN><BR>&nbsp;</P>
<P class=Default><SPAN style="FONT-SIZE: 11.5pt">The project of Nuclotron-based Ion Collider Facility NICA/MPD (Multi Purpose Detector) under development at JINR (Dubna) is presented. The general goals of the project are providing of colliding beams for experimental studies of both hot and dense strongly interacting baryonic matter and spin physics (in collisions of polarized protons and deuterons). The first program requires providing of heavy ion collisions in the energy range of √</SPAN><SPAN style="FONT-SIZE: 10pt">S</SPAN><SUB><SPAN style="FONT-SIZE: 8pt">NN</SPAN></SUB><SPAN style="FONT-SIZE: 8pt"> </SPAN><SPAN style="FONT-SIZE: 11.5pt">= 4÷11 GeV at average luminosity of <BR></SPAN></P>
<P class=Default><SPAN style="FONT-SIZE: 11.5pt"><I>L </I>= 1x10</SPAN><SUP><SPAN style="FONT-SIZE: 8pt">27</SPAN></SUP><SPAN style="FONT-SIZE: 8pt"> </SPAN><SPAN style="FONT-SIZE: 11.5pt">cm </SPAN><SUP><SPAN style="FONT-SIZE: 8pt">-2</SPAN></SUP><SPAN style="FONT-SIZE: 11.5pt">S </SPAN><SUP><SPAN style="FONT-SIZE: 8pt">-1</SPAN></SUP><SPAN style="FONT-SIZE: 8pt"> </SPAN><SPAN style="FONT-SIZE: 11.5pt">for </SPAN><SUP><SPAN style="FONT-SIZE: 8pt">197</SPAN></SUP><SPAN style="FONT-SIZE: 11.5pt">Au </SPAN><SUP><SPAN style="FONT-SIZE: 8pt">79+</SPAN></SUP><SPAN style="FONT-SIZE: 8pt"> </SPAN><SPAN style="FONT-SIZE: 11.5pt">nuclei. </SPAN></P>
<P class=Default><SPAN style="FONT-SIZE: 11.5pt">The polarized beams mode is proposed to be used in energy range of √</SPAN><SPAN style="FONT-SIZE: 10pt">S</SPAN><SUB><SPAN style="FONT-SIZE: 8pt">NN</SPAN></SUB><SPAN style="FONT-SIZE: 8pt"> </SPAN><SPAN style="FONT-SIZE: 11.5pt">= 12 ÷ 27 GeV (protons) at luminosity of</SPAN> <I><SPAN style="FONT-SIZE: 11.5pt">L </SPAN></I><SPAN style="FONT-SIZE: 11.5pt">~ 1x10</SPAN><SUP><SPAN style="FONT-SIZE: 8pt">32</SPAN></SUP><SPAN style="FONT-SIZE: 8pt"> </SPAN><SPAN style="FONT-SIZE: 11.5pt">cm</SPAN><SUP><SPAN style="FONT-SIZE: 8pt">-2</SPAN></SUP><SPAN style="FONT-SIZE: 11.5pt">.</SPAN><SPAN style="FONT-SIZE: 10pt">S </SPAN><SUP><SPAN style="FONT-SIZE: 8pt">–1</SPAN></SUP><SPAN style="FONT-SIZE: 11.5pt">. The key issue of the Project is application of cooling methods – stochastic and electron ones. The report contains the description of the hot and dense baryonic matter specific expected features, the requirements to the parameters and scheme of the accelerator facility aimed for experimental studies of the matter in such a state, the status of the Project development.</SPAN></P>
<P class=Default><SPAN style="FONT-SIZE: 11.5pt">&nbsp;</SPAN></P>
<P class=Default><SPAN style="FONT-SIZE: 11.5pt">Tuesday, December 3, 2013</SPAN></P>
<P class=Default><SPAN style="FONT-SIZE: 11.5pt">11:00 a.m.</SPAN></P>
<P class=Default><SPAN style="FONT-SIZE: 11.5pt">CEBAF Center, Room F113</SPAN></P><BR>Sent on behalf of Audrey Barron<BR>-- <BR>
<DIV><SPAN></SPAN><I>Carolyn Camp</I><BR><FONT size=3>Administrative Assistant<BR>SRF Operations/R&amp;D<BR>Mail stop 55-H<BR>757-269-7403</FONT><SPAN></SPAN><BR></DIV></DIV><BR>_______________________________________________<BR>Accelerator_staff mailing list<BR>Accelerator_staff@jlab.org<BR>https://mailman.jlab.org/mailman/listinfo/accelerator_staff</DIV><BR></div></body></html>