[Esr-users] Halls B and C today
Dave Kashy
kashy at jlab.org
Thu Nov 2 09:58:10 EDT 2017
Hi Paul,
The UPS's that we are changing out provide backup power to our PLC's so we will run blind and w/o PLC control during each UPS swap and there are 4 units.
We will do our best to limit the bump size, but no garantee that you will not see a bump.
Dave
----- Original Message -----
From: "brindza" <brindza at jlab.org>
To: "kashy" <kashy at jlab.org>, "esr-users" <esr-users at jlab.org>
Cc: "rossi patrizia" <rossi at jlab.org>, "Rolf Ent" <ent at jlab.org>
Sent: Thursday, November 2, 2017 9:17:24 AM
Subject: Hall C today
Hi
We will be doing magnetic field measurements on the HMS Dipole today.
We have to acquire a full B vs I curve thru the entire range of the
Physics run 1000 Amps to 2800 Amps with a "locked on" NMR.
System stability will help a lot because this operation is extremely
intolerant of even the smallest fault.
A failure of the NMR to lock at any point invalidates the entire data
set and you have to start over.
A magnet trip for any reason during this process will necessitate a do over.
HB retrained up to 3665 Amps yesterday without incident and no further
retraining runs are planned any time soon.
This run was to confirm that there were no ill effects of removing a
piece of unexpected magnetic material.(see below)
We will have to revisit the retraining at some point because we have not
surpassed the 11 GeV current but we are past requirements for the winter
2017/18 Physics run.
HB beam line stray fields will be remeasured this week probably
starting Friday.
This is necessary because we removed a magnetic bracket that was part of
the installed field clamp but not in the TOSA model and it had an effect.
Some further magnetic measurements on SHMS Q2Q3 and Dipole are likely in
the very near future.
Hall C continues to hunt down and repair CVI valves that are past their
"use by" date.
Cheers
Paul