[Esr-users] [New Logentry] Hall C Moller JT control cables connected

gaskelld at jlab.org gaskelld at jlab.org
Thu Aug 16 09:30:05 EDT 2018


Logentry Text:
--
This morning I reconnected the JT valve control cables for the Hall C Moller solenoid.  All valves are still closed, and software control disabled.  Prior to connecting the control cables, I verified that ioc reboots would not result in unexpected valve motion (software control remained disabled after reboot - requires manual intervention to enable).

The Hall C Moller will not be cooled until just before tests of the Hall C Moller polarimeter - TBD, sometime during the fall 2018 run.


---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/3587695
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/esr-users/attachments/20180816/20405a74/attachment.html>


More information about the Esr-users mailing list