Greetings
Measurements of the cold return pressures in Hall C along the transfer
lines to the SHMS indicate that the transfer lines are OK.
Pressure readings( see below) are very close to previous measurements
made during investigation of Anaconda pressure drop.
Some SHMS Magnets are at considerably higher pressure than the transfer
line.
Checking cold return valves for possible blockage will start in a few
minutes.
Cheers
Paul
helium cold return pressure measurements:
P(psi) t
3.26 11:38 @ WBS7 u-tube, WBS7 side
3.65 11:39 @ A can u-tube for anaconda
7.68 11:41 @ SHMS transfer line can #1, anaconda
7.74 11:42 @ SHMS transfer line can #2, at Q2
7.81 11:43 @ SHMS transfer line can #3, at Q3