[Esr-users] [New Logentry] Follow-up Re: Hall B 4K cryoshutdown
kashy at jlab.org
kashy at jlab.org
Thu May 10 13:30:01 EDT 2018
Logentry Text:
--
Torus and Solenoid emptied of liquid at ~12:30pm
Buffer dewar still has 56% level (started at 60%)
Solenoid Coil average temperature is 5.93K
Torus Coil average temperature is 15.03K
First small vacuum burp at ~11:00 when most of the magnet was between 9 and 14K (Hydrogen?)
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3574370
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/esr-users/attachments/20180510/f69cc9cc/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: clonpc21_20180510_132627.gif
Type: image/gif
Size: 84243 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/esr-users/attachments/20180510/f69cc9cc/attachment-0002.gif>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: clonpc21_20180510_132646.gif
Type: image/gif
Size: 61280 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/esr-users/attachments/20180510/f69cc9cc/attachment-0003.gif>
More information about the Esr-users
mailing list